| Changed: | ||||||||
| < < | Most recent projected start date for rock excavation - 9 Jan 2009 | |||||||
| > > | March 2010 - We will be given 1 month notice before final trench is dug. Anticipated date is not included in current construction schedules. | |||||||
Cryo EMAs many of you know, CUNY is building two new science buildings immediately adjacent to NYSBC. We now have some details about the construction schedule. Excavation will be the most disturbing and is currently planned after Oct 16 2009, though these dates may shift. CUNY are indicating that the most disturbing activities (blasting, hoe ramming, debris clearing) will occur between Monday and Saturday during this period. These activities will cause enough noise and vibration that the microscopes will likely be unusable while they are working. Our solution to this problem is to shift NYSBC CEM operation to late afternoon/evening. Our official hours of operation are now 9 am to 5 pm, and we plan to shift to a 2 pm to 10 pm schedule. These hours may be shifted even later if CUNY decides to work overtime (normal ending time for them is 3:30). They have agreed to provide more specific details so that we may work normal hours during quiet days, or when construction is far from the building. Thus, a more specific schedule will be posted on the intranet ( CemConstructionschedule ) on an ongoing basis and we will send out an email to all users each week detailing the schedule for the following week. We also will encourage use on the one truly quiet day, Sunday. Staff will be present during these shifted hours, and All Hours certification will not required as long as NYSBC staff are present. Nevertheless, we encourage all users to obtain All Hours certification for maximum flexibility during this time (instructions can be found at http://www.nysbc.net/procedures/C14/). In addition, it may be possible to collect data overnight with help from automation software; this will depend on the type of sample and whether the user is required to be present for sample identification. We apologize for this disruption in the schedule. Remember that the main construction is not scheduled to begin until the end of August, so please try to make best use of the available month of quiet time. -- William Rice, Ph.D.NMRThere are no expected impacts on NMR facility operations. Several magnets are being vibrationally monitored, but there should be no effect on users. Please advise of any adverse experience ASAP to nmrschedule@nysbc.orgOtherBecause of this construction, the following steps are being taken
| ||||||||