Difference: CurrentAnnouncementsEM (1 vs. 14)

Revision 1425 May 2010 - Main.KdDerr

 
META TOPICPARENT name="CurrentAnnouncementsNMR"

CUNY excavation. Change of schedules, All hours, late night, weekend, and holiday access.

EM users should be aware of possible Construction Impact until further notice. The detailed look ahead for EM scheduling is at Cem Constructionschedule.
Changed:
<
<

EM Journal Club

>
>

CemSeminarsCourses

Deleted:
<
<
  • 6 May 2010 - 4-6pm (A-11)- EM Journal Club, FabianaRenzi presents FREALIGN: High resolution refinement of single particle structures by Nikolaus Grigorieff J Struct Biol 157 117-25 (2007)
  • 20 May 2010 - 4-6pm (A-11)- EM Journal Club, RubenDiaz presents "Comparison of Available Dual Beam Technologies"
 

Current EM Newsletter



Pages with additional details specifically for sort PIs sort NMR Users sort EM Users sort Beam line Users sortup External events sort


Meta Group Meetings in next six weeks

Meetings normally held in A-11 NYSBC at 130P unless noted. See also MetaGroupFaqs?


The summer meeting of the New York Structural Biology discussion group will be held August 4.


Grants

NIH awards $1.96M for a Dual-Beam Scanning EM at NYSBC. Congratulations to Prof. Stokes and his co-investigators .
NIH awards $2.309M for the Dynamic Nuclear Polarization NMR proposal at NYSBC. Congratulations to Prof. McDermott and her co-investigators.
NSF awards $3.5M for "Development of a Synchrotron Beamline for High-resolution Microdiffraction Analysis of Biological Macromolecules". Congratulations to Prof. Hendrickson and his co-investigators.


Other



UPDATED

Grant Citations: Please remember to acknowledge NIH supported equipment in any submitted manuscripts: http://www.nysbc.net/twiki/bin/view/Main/SupportStatement

700: The FCNMR high-field field-cycler (HFFC), a belt driven shuttle device, has been installed. The spectrometer is still available for standard non-shuttled experiments. The only difference though is the eject air is no longer used to insert sample in the magnet. This function is now done using the shuttle, it requires the use of unbroken shigemi or 7" standard tubes. Because of mechanical limitations 8" or 9" standard tubes or shigemi tubes that are short because of damage cannot be used.




NYSBC Infotech WILL NEVER ASK YOU TO PROVIDE PASSWORD INFORMATION, AND WILL NOT ASK YOU TO OPEN FILES ATTACHED TO EMAILS. PLEASE EXERCISE CARE WITH DECEPTIVE EMAILS

  • NYSBC closed on Federal Holidays -
  • 19 Jun 2026 - Friday, Jun 19 Juneteenth National Independence Day
  • 03 Jul 2026 - Friday, Jul 3 Independence Day (observed)
  • 07 Sep 2026 - Monday, Sep 7 Labor Day


You can get further information on accessing the intranet web pages referenced. If you received this announcement by email, you can link to the current page. You can access and list events external to NYSBC?. This page is emailed to all current affiliates and intranet registered persons on major changes and about 28, 7 and 3 days before events. You can suppress emails to you from this source. You can be notified when this page changes by adding your name to CurrentAnnouncementsGroup

Changed:
<
<
META FILEATTACHMENT attachment="Ge_Zhou_2010_science_Virus.pdf" attr="h" comment="" date="1268667576" name="Ge_Zhou_2010_science_Virus.pdf" path="Ge_Zhou_2010_science_Virus.pdf" size="717365" stream="Ge_Zhou_2010_science_Virus.pdf" user="Main.KdDerr" version="1"
META FILEATTACHMENT attachment="May_June2010newsletterweb.pdf" attr="h" comment="" date="1273171209" name="May_June2010newsletterweb.pdf" path="May_June2010newsletterweb.pdf" size="421597" stream="May_June2010newsletterweb.pdf" user="Main.KdDerr" version="1"
>
>
META FILEATTACHMENT attr="h" autoattached="1" comment="" date="1268667577" name="Ge_Zhou_2010_science_Virus.pdf" path="Ge_Zhou_2010_science_Virus.pdf" size="717365" user="Main.KdDerr" version="1"
META FILEATTACHMENT attr="h" autoattached="1" comment="" date="1273171209" name="May_June2010newsletterweb.pdf" path="May_June2010newsletterweb.pdf" size="421597" user="Main.KdDerr" version="1"
 

Revision 1306 May 2010 - Main.KdDerr

 
META TOPICPARENT name="CurrentAnnouncementsNMR"

CUNY excavation. Change of schedules, All hours, late night, weekend, and holiday access.

EM users should be aware of possible Construction Impact until further notice. The detailed look ahead for EM scheduling is at Cem Constructionschedule.

EM Journal Club

  • 6 May 2010 - 4-6pm (A-11)- EM Journal Club, FabianaRenzi presents FREALIGN: High resolution refinement of single particle structures by Nikolaus Grigorieff J Struct Biol 157 117-25 (2007)
  • 20 May 2010 - 4-6pm (A-11)- EM Journal Club, RubenDiaz presents "Comparison of Available Dual Beam Technologies"

Current EM Newsletter



Pages with additional details specifically for sort PIs sort NMR Users sort EM Users sort Beam line Users sort External events sort


Meta Group Meetings in next six weeks

Meetings normally held in A-11 NYSBC at 130P unless noted. See also MetaGroupFaqs?


The summer meeting of the New York Structural Biology discussion group will be held August 4.


Grants

NIH awards $1.96M for a Dual-Beam Scanning EM at NYSBC. Congratulations to Prof. Stokes and his co-investigators .
NIH awards $2.309M for the Dynamic Nuclear Polarization NMR proposal at NYSBC. Congratulations to Prof. McDermott and her co-investigators.
NSF awards $3.5M for "Development of a Synchrotron Beamline for High-resolution Microdiffraction Analysis of Biological Macromolecules". Congratulations to Prof. Hendrickson and his co-investigators.


Other



UPDATED

Grant Citations: Please remember to acknowledge NIH supported equipment in any submitted manuscripts: http://www.nysbc.net/twiki/bin/view/Main/SupportStatement

700: The FCNMR high-field field-cycler (HFFC), a belt driven shuttle device, has been installed. The spectrometer is still available for standard non-shuttled experiments. The only difference though is the eject air is no longer used to insert sample in the magnet. This function is now done using the shuttle, it requires the use of unbroken shigemi or 7" standard tubes. Because of mechanical limitations 8" or 9" standard tubes or shigemi tubes that are short because of damage cannot be used.




NYSBC Infotech WILL NEVER ASK YOU TO PROVIDE PASSWORD INFORMATION, AND WILL NOT ASK YOU TO OPEN FILES ATTACHED TO EMAILS. PLEASE EXERCISE CARE WITH DECEPTIVE EMAILS

  • NYSBC closed on Federal Holidays -
  • 19 Jun 2026 - Friday, Jun 19 Juneteenth National Independence Day
  • 03 Jul 2026 - Friday, Jul 3 Independence Day (observed)
  • 07 Sep 2026 - Monday, Sep 7 Labor Day


You can get further information on accessing the intranet web pages referenced. If you received this announcement by email, you can link to the current page. You can access and list events external to NYSBC?. This page is emailed to all current affiliates and intranet registered persons on major changes and about 28, 7 and 3 days before events. You can suppress emails to you from this source. You can be notified when this page changes by adding your name to CurrentAnnouncementsGroup

META FILEATTACHMENT attachment="Ge_Zhou_2010_science_Virus.pdf" attr="h" comment="" date="1268667576" name="Ge_Zhou_2010_science_Virus.pdf" path="Ge_Zhou_2010_science_Virus.pdf" size="717365" stream="Ge_Zhou_2010_science_Virus.pdf" user="Main.KdDerr" version="1"
Added:
>
>
META FILEATTACHMENT attachment="May_June2010newsletterweb.pdf" attr="h" comment="" date="1273171209" name="May_June2010newsletterweb.pdf" path="May_June2010newsletterweb.pdf" size="421597" stream="May_June2010newsletterweb.pdf" user="Main.KdDerr" version="1"
 

Revision 1206 May 2010 - Main.KdDerr

 
META TOPICPARENT name="CurrentAnnouncementsNMR"

CUNY excavation. Change of schedules, All hours, late night, weekend, and holiday access.

EM users should be aware of possible Construction Impact until further notice. The detailed look ahead for EM scheduling is at Cem Constructionschedule.

EM Journal Club

Changed:
<
<
>
>
  • 6 May 2010 - 4-6pm (A-11)- EM Journal Club, FabianaRenzi presents FREALIGN: High resolution refinement of single particle structures by Nikolaus Grigorieff J Struct Biol 157 117-25 (2007)
  • 20 May 2010 - 4-6pm (A-11)- EM Journal Club, RubenDiaz presents "Comparison of Available Dual Beam Technologies"
Added:
>
>

Current EM Newsletter

 


Pages with additional details specifically for sort PIs sort NMR Users sort EM Users sort Beam line Users sort External events sort


Meta Group Meetings in next six weeks

Meetings normally held in A-11 NYSBC at 130P unless noted. See also MetaGroupFaqs?


The summer meeting of the New York Structural Biology discussion group will be held August 4.


Grants

NIH awards $1.96M for a Dual-Beam Scanning EM at NYSBC. Congratulations to Prof. Stokes and his co-investigators .
NIH awards $2.309M for the Dynamic Nuclear Polarization NMR proposal at NYSBC. Congratulations to Prof. McDermott and her co-investigators.
NSF awards $3.5M for "Development of a Synchrotron Beamline for High-resolution Microdiffraction Analysis of Biological Macromolecules". Congratulations to Prof. Hendrickson and his co-investigators.


Other



UPDATED

Grant Citations: Please remember to acknowledge NIH supported equipment in any submitted manuscripts: http://www.nysbc.net/twiki/bin/view/Main/SupportStatement

700: The FCNMR high-field field-cycler (HFFC), a belt driven shuttle device, has been installed. The spectrometer is still available for standard non-shuttled experiments. The only difference though is the eject air is no longer used to insert sample in the magnet. This function is now done using the shuttle, it requires the use of unbroken shigemi or 7" standard tubes. Because of mechanical limitations 8" or 9" standard tubes or shigemi tubes that are short because of damage cannot be used.




NYSBC Infotech WILL NEVER ASK YOU TO PROVIDE PASSWORD INFORMATION, AND WILL NOT ASK YOU TO OPEN FILES ATTACHED TO EMAILS. PLEASE EXERCISE CARE WITH DECEPTIVE EMAILS

  • NYSBC closed on Federal Holidays -
  • 19 Jun 2026 - Friday, Jun 19 Juneteenth National Independence Day
  • 03 Jul 2026 - Friday, Jul 3 Independence Day (observed)
  • 07 Sep 2026 - Monday, Sep 7 Labor Day


You can get further information on accessing the intranet web pages referenced. If you received this announcement by email, you can link to the current page. You can access and list events external to NYSBC?. This page is emailed to all current affiliates and intranet registered persons on major changes and about 28, 7 and 3 days before events. You can suppress emails to you from this source. You can be notified when this page changes by adding your name to CurrentAnnouncementsGroup

META FILEATTACHMENT attachment="Ge_Zhou_2010_science_Virus.pdf" attr="h" comment="" date="1268667576" name="Ge_Zhou_2010_science_Virus.pdf" path="Ge_Zhou_2010_science_Virus.pdf" size="717365" stream="Ge_Zhou_2010_science_Virus.pdf" user="Main.KdDerr" version="1"

Revision 1106 May 2010 - Main.KdDerr

 
META TOPICPARENT name="CurrentAnnouncementsNMR"

CUNY excavation. Change of schedules, All hours, late night, weekend, and holiday access.

EM users should be aware of possible Construction Impact until further notice. The detailed look ahead for EM scheduling is at Cem Constructionschedule.

EM Journal Club



Pages with additional details specifically for sort PIs sort NMR Users sort EM Users sort Beam line Users sort External events sort


Meta Group Meetings in next six weeks

Meetings normally held in A-11 NYSBC at 130P unless noted. See also MetaGroupFaqs?


The summer meeting of the New York Structural Biology discussion group will be held August 4.


Grants

NIH awards $1.96M for a Dual-Beam Scanning EM at NYSBC. Congratulations to Prof. Stokes and his co-investigators .
NIH awards $2.309M for the Dynamic Nuclear Polarization NMR proposal at NYSBC. Congratulations to Prof. McDermott and her co-investigators.
NSF awards $3.5M for "Development of a Synchrotron Beamline for High-resolution Microdiffraction Analysis of Biological Macromolecules". Congratulations to Prof. Hendrickson and his co-investigators.


Other



UPDATED

Grant Citations: Please remember to acknowledge NIH supported equipment in any submitted manuscripts: http://www.nysbc.net/twiki/bin/view/Main/SupportStatement

700: The FCNMR high-field field-cycler (HFFC), a belt driven shuttle device, has been installed. The spectrometer is still available for standard non-shuttled experiments. The only difference though is the eject air is no longer used to insert sample in the magnet. This function is now done using the shuttle, it requires the use of unbroken shigemi or 7" standard tubes. Because of mechanical limitations 8" or 9" standard tubes or shigemi tubes that are short because of damage cannot be used.




NYSBC Infotech WILL NEVER ASK YOU TO PROVIDE PASSWORD INFORMATION, AND WILL NOT ASK YOU TO OPEN FILES ATTACHED TO EMAILS. PLEASE EXERCISE CARE WITH DECEPTIVE EMAILS

  • NYSBC closed on Federal Holidays -
  • 19 Jun 2026 - Friday, Jun 19 Juneteenth National Independence Day
  • 03 Jul 2026 - Friday, Jul 3 Independence Day (observed)
  • 07 Sep 2026 - Monday, Sep 7 Labor Day


You can get further information on accessing the intranet web pages referenced. If you received this announcement by email, you can link to the current page. You can access and list events external to NYSBC?. This page is emailed to all current affiliates and intranet registered persons on major changes and about 28, 7 and 3 days before events. You can suppress emails to you from this source. You can be notified when this page changes by adding your name to CurrentAnnouncementsGroup

META FILEATTACHMENT attachment="Ge_Zhou_2010_science_Virus.pdf" attr="h" comment="" date="1268667576" name="Ge_Zhou_2010_science_Virus.pdf" path="Ge_Zhou_2010_science_Virus.pdf" size="717365" stream="Ge_Zhou_2010_science_Virus.pdf" user="Main.KdDerr" version="1"

Revision 1015 Mar 2010 - Main.KdDerr

 
META TOPICPARENT name="CurrentAnnouncementsNMR"

CUNY excavation. Change of schedules, All hours, late night, weekend, and holiday access.

EM users should be aware of possible Construction Impact until further notice. The detailed look ahead for EM scheduling is at Cem Constructionschedule.

EM Journal Club

Changed:
<
<
>
>
 


Pages with additional details specifically for sort PIs sort NMR Users sort EM Users sort Beam line Users sort External events sort


Meta Group Meetings in next six weeks

Meetings normally held in A-11 NYSBC at 130P unless noted. See also MetaGroupFaqs?


The summer meeting of the New York Structural Biology discussion group will be held August 4.


Grants

NIH awards $1.96M for a Dual-Beam Scanning EM at NYSBC. Congratulations to Prof. Stokes and his co-investigators .
NIH awards $2.309M for the Dynamic Nuclear Polarization NMR proposal at NYSBC. Congratulations to Prof. McDermott and her co-investigators.
NSF awards $3.5M for "Development of a Synchrotron Beamline for High-resolution Microdiffraction Analysis of Biological Macromolecules". Congratulations to Prof. Hendrickson and his co-investigators.


Other



UPDATED

Grant Citations: Please remember to acknowledge NIH supported equipment in any submitted manuscripts: http://www.nysbc.net/twiki/bin/view/Main/SupportStatement

700: The FCNMR high-field field-cycler (HFFC), a belt driven shuttle device, has been installed. The spectrometer is still available for standard non-shuttled experiments. The only difference though is the eject air is no longer used to insert sample in the magnet. This function is now done using the shuttle, it requires the use of unbroken shigemi or 7" standard tubes. Because of mechanical limitations 8" or 9" standard tubes or shigemi tubes that are short because of damage cannot be used.




NYSBC Infotech WILL NEVER ASK YOU TO PROVIDE PASSWORD INFORMATION, AND WILL NOT ASK YOU TO OPEN FILES ATTACHED TO EMAILS. PLEASE EXERCISE CARE WITH DECEPTIVE EMAILS

  • NYSBC closed on Federal Holidays -
  • 19 Jun 2026 - Friday, Jun 19 Juneteenth National Independence Day
  • 03 Jul 2026 - Friday, Jul 3 Independence Day (observed)
  • 07 Sep 2026 - Monday, Sep 7 Labor Day


You can get further information on accessing the intranet web pages referenced. If you received this announcement by email, you can link to the current page. You can access and list events external to NYSBC?. This page is emailed to all current affiliates and intranet registered persons on major changes and about 28, 7 and 3 days before events. You can suppress emails to you from this source. You can be notified when this page changes by adding your name to CurrentAnnouncementsGroup

META FILEATTACHMENT attachment="Ge_Zhou_2010_science_Virus.pdf" attr="h" comment="" date="1268667576" name="Ge_Zhou_2010_science_Virus.pdf" path="Ge_Zhou_2010_science_Virus.pdf" size="717365" stream="Ge_Zhou_2010_science_Virus.pdf" user="Main.KdDerr" version="1"

Revision 915 Mar 2010 - Main.DavidCowburn

 
META TOPICPARENT name="CurrentAnnouncementsNMR"

CUNY excavation. Change of schedules, All hours, late night, weekend, and holiday access.

EM users should be aware of possible Construction Impact until further notice. The detailed look ahead for EM scheduling is at Cem Constructionschedule.

EM Journal Club

Changed:
<
<
  • Mar 25 2010 @ 4PM Paul Gottleib Presents Presents [[http://www.nysbc.net/twiki/pub/Main/CurrentAnnouncementsEM/Ge_Zhou_2010_science_Virus.pdf][Cryo-EM Model of the Bullet-Shaped Vesicular Stomatitis Virus] by Peng Ge, et al. Science 327, 689 (2010)
>
>
 
  • Apr 08 2010 @ 4PM Sacha DeCarlo TBA
  • Apr 22 2010 @ 4PM TBA



Pages with additional details specifically for sort PIs sort NMR Users sort EM Users sort Beam line Users sort External events sort


Meta Group Meetings in next six weeks

Meetings normally held in A-11 NYSBC at 130P unless noted. See also MetaGroupFaqs?


The summer meeting of the New York Structural Biology discussion group will be held August 4.


Grants

NIH awards $1.96M for a Dual-Beam Scanning EM at NYSBC. Congratulations to Prof. Stokes and his co-investigators .
NIH awards $2.309M for the Dynamic Nuclear Polarization NMR proposal at NYSBC. Congratulations to Prof. McDermott and her co-investigators.
NSF awards $3.5M for "Development of a Synchrotron Beamline for High-resolution Microdiffraction Analysis of Biological Macromolecules". Congratulations to Prof. Hendrickson and his co-investigators.


Other



UPDATED

Grant Citations: Please remember to acknowledge NIH supported equipment in any submitted manuscripts: http://www.nysbc.net/twiki/bin/view/Main/SupportStatement

700: The FCNMR high-field field-cycler (HFFC), a belt driven shuttle device, has been installed. The spectrometer is still available for standard non-shuttled experiments. The only difference though is the eject air is no longer used to insert sample in the magnet. This function is now done using the shuttle, it requires the use of unbroken shigemi or 7" standard tubes. Because of mechanical limitations 8" or 9" standard tubes or shigemi tubes that are short because of damage cannot be used.




NYSBC Infotech WILL NEVER ASK YOU TO PROVIDE PASSWORD INFORMATION, AND WILL NOT ASK YOU TO OPEN FILES ATTACHED TO EMAILS. PLEASE EXERCISE CARE WITH DECEPTIVE EMAILS

  • NYSBC closed on Federal Holidays -
  • 19 Jun 2026 - Friday, Jun 19 Juneteenth National Independence Day
  • 03 Jul 2026 - Friday, Jul 3 Independence Day (observed)
  • 07 Sep 2026 - Monday, Sep 7 Labor Day


You can get further information on accessing the intranet web pages referenced. If you received this announcement by email, you can link to the current page. You can access and list events external to NYSBC?. This page is emailed to all current affiliates and intranet registered persons on major changes and about 28, 7 and 3 days before events. You can suppress emails to you from this source. You can be notified when this page changes by adding your name to CurrentAnnouncementsGroup

META FILEATTACHMENT attachment="Ge_Zhou_2010_science_Virus.pdf" attr="h" comment="" date="1268667576" name="Ge_Zhou_2010_science_Virus.pdf" path="Ge_Zhou_2010_science_Virus.pdf" size="717365" stream="Ge_Zhou_2010_science_Virus.pdf" user="Main.KdDerr" version="1"

Revision 815 Mar 2010 - Main.DavidCowburn

 
META TOPICPARENT name="CurrentAnnouncementsNMR"

CUNY excavation. Change of schedules, All hours, late night, weekend, and holiday access.

EM users should be aware of possible Construction Impact until further notice. The detailed look ahead for EM scheduling is at Cem Constructionschedule.

EM Journal Club

  • Mar 25 2010 @ 4PM Paul Gottleib Presents Presents [[http://www.nysbc.net/twiki/pub/Main/CurrentAnnouncementsEM/Ge_Zhou_2010_science_Virus.pdf][Cryo-EM Model of the Bullet-Shaped Vesicular Stomatitis Virus] by Peng Ge, et al. Science 327, 689 (2010)
  • Apr 08 2010 @ 4PM Sacha DeCarlo TBA
  • Apr 22 2010 @ 4PM TBA



Pages with additional details specifically for sort PIs sort NMR Users sort EM Users sort Beam line Users sort External events sort


Meta Group Meetings in next six weeks

Meetings normally held in A-11 NYSBC at 130P unless noted. See also MetaGroupFaqs?


The summer meeting of the New York Structural Biology discussion group will be held August 4.


Grants

NIH awards $1.96M for a Dual-Beam Scanning EM at NYSBC. Congratulations to Prof. Stokes and his co-investigators .
NIH awards $2.309M for the Dynamic Nuclear Polarization NMR proposal at NYSBC. Congratulations to Prof. McDermott and her co-investigators.
NSF awards $3.5M for "Development of a Synchrotron Beamline for High-resolution Microdiffraction Analysis of Biological Macromolecules". Congratulations to Prof. Hendrickson and his co-investigators.


Other



UPDATED

Grant Citations: Please remember to acknowledge NIH supported equipment in any submitted manuscripts: http://www.nysbc.net/twiki/bin/view/Main/SupportStatement

700: The FCNMR high-field field-cycler (HFFC), a belt driven shuttle device, has been installed. The spectrometer is still available for standard non-shuttled experiments. The only difference though is the eject air is no longer used to insert sample in the magnet. This function is now done using the shuttle, it requires the use of unbroken shigemi or 7" standard tubes. Because of mechanical limitations 8" or 9" standard tubes or shigemi tubes that are short because of damage cannot be used.




NYSBC Infotech WILL NEVER ASK YOU TO PROVIDE PASSWORD INFORMATION, AND WILL NOT ASK YOU TO OPEN FILES ATTACHED TO EMAILS. PLEASE EXERCISE CARE WITH DECEPTIVE EMAILS

  • NYSBC closed on Federal Holidays -
  • 19 Jun 2026 - Friday, Jun 19 Juneteenth National Independence Day
  • 03 Jul 2026 - Friday, Jul 3 Independence Day (observed)
  • 07 Sep 2026 - Monday, Sep 7 Labor Day


You can get further information on accessing the intranet web pages referenced. If you received this announcement by email, you can link to the current page. You can access and list events external to NYSBC?. This page is emailed to all current affiliates and intranet registered persons on major changes and about 28, 7 and 3 days before events. You can suppress emails to you from this source. You can be notified when this page changes by adding your name to CurrentAnnouncementsGroup

Changed:
<
<
>
>
 
META FILEATTACHMENT attachment="Ge_Zhou_2010_science_Virus.pdf" attr="h" comment="" date="1268667576" name="Ge_Zhou_2010_science_Virus.pdf" path="Ge_Zhou_2010_science_Virus.pdf" size="717365" stream="Ge_Zhou_2010_science_Virus.pdf" user="Main.KdDerr" version="1"

Revision 715 Mar 2010 - Main.DavidCowburn

 
META TOPICPARENT name="CurrentAnnouncementsNMR"

CUNY excavation. Change of schedules, All hours, late night, weekend, and holiday access.

EM users should be aware of possible Construction Impact until further notice. The detailed look ahead for EM scheduling is at Cem Constructionschedule.

EM Journal Club

  • Mar 25 2010 @ 4PM Paul Gottleib Presents Presents [[http://www.nysbc.net/twiki/pub/Main/CurrentAnnouncementsEM/Ge_Zhou_2010_science_Virus.pdf][Cryo-EM Model of the Bullet-Shaped Vesicular Stomatitis Virus] by Peng Ge, et al. Science 327, 689 (2010)
  • Apr 08 2010 @ 4PM Sacha DeCarlo TBA
  • Apr 22 2010 @ 4PM TBA



Pages with additional details specifically for sort PIs sort NMR Users sort EM Users sort Beam line Users sort External events sort


Meta Group Meetings in next six weeks

Meetings normally held in A-11 NYSBC at 130P unless noted. See also MetaGroupFaqs?


The summer meeting of the New York Structural Biology discussion group will be held August 4.


Grants

NIH awards $1.96M for a Dual-Beam Scanning EM at NYSBC. Congratulations to Prof. Stokes and his co-investigators .
NIH awards $2.309M for the Dynamic Nuclear Polarization NMR proposal at NYSBC. Congratulations to Prof. McDermott and her co-investigators.
NSF awards $3.5M for "Development of a Synchrotron Beamline for High-resolution Microdiffraction Analysis of Biological Macromolecules". Congratulations to Prof. Hendrickson and his co-investigators.


Other



UPDATED

Grant Citations: Please remember to acknowledge NIH supported equipment in any submitted manuscripts: http://www.nysbc.net/twiki/bin/view/Main/SupportStatement

700: The FCNMR high-field field-cycler (HFFC), a belt driven shuttle device, has been installed. The spectrometer is still available for standard non-shuttled experiments. The only difference though is the eject air is no longer used to insert sample in the magnet. This function is now done using the shuttle, it requires the use of unbroken shigemi or 7" standard tubes. Because of mechanical limitations 8" or 9" standard tubes or shigemi tubes that are short because of damage cannot be used.




NYSBC Infotech WILL NEVER ASK YOU TO PROVIDE PASSWORD INFORMATION, AND WILL NOT ASK YOU TO OPEN FILES ATTACHED TO EMAILS. PLEASE EXERCISE CARE WITH DECEPTIVE EMAILS

  • NYSBC closed on Federal Holidays -
  • 19 Jun 2026 - Friday, Jun 19 Juneteenth National Independence Day
  • 03 Jul 2026 - Friday, Jul 3 Independence Day (observed)
  • 07 Sep 2026 - Monday, Sep 7 Labor Day


You can get further information on accessing the intranet web pages referenced. If you received this announcement by email, you can link to the current page. You can access and list events external to NYSBC?. This page is emailed to all current affiliates and intranet registered persons on major changes and about 28, 7 and 3 days before events. You can suppress emails to you from this source. You can be notified when this page changes by adding your name to CurrentAnnouncementsGroup

Deleted:
<
<
CONFLICT version 5:
* Ge_Zhou_2010_science_Virus.pdf: Ge_Zhou_2010_science_Virus.pdf
CONFLICT version new:
 
Deleted:
<
<
CONFLICT end
 
META FILEATTACHMENT attachment="Ge_Zhou_2010_science_Virus.pdf" attr="h" comment="" date="1268667576" name="Ge_Zhou_2010_science_Virus.pdf" path="Ge_Zhou_2010_science_Virus.pdf" size="717365" stream="Ge_Zhou_2010_science_Virus.pdf" user="Main.KdDerr" version="1"

Revision 615 Mar 2010 - Main.DavidCowburn

 
META TOPICPARENT name="CurrentAnnouncementsNMR"

CUNY excavation. Change of schedules, All hours, late night, weekend, and holiday access.

EM users should be aware of possible Construction Impact until further notice. The detailed look ahead for EM scheduling is at Cem Constructionschedule.

EM Journal Club

  • Mar 25 2010 @ 4PM Paul Gottleib Presents Presents [[http://www.nysbc.net/twiki/pub/Main/CurrentAnnouncementsEM/Ge_Zhou_2010_science_Virus.pdf][Cryo-EM Model of the Bullet-Shaped Vesicular Stomatitis Virus] by Peng Ge, et al. Science 327, 689 (2010)
  • Apr 08 2010 @ 4PM Sacha DeCarlo TBA
  • Apr 22 2010 @ 4PM TBA



Pages with additional details specifically for sort PIs sort NMR Users sort EM Users sort Beam line Users sort External events sort


Meta Group Meetings in next six weeks

Meetings normally held in A-11 NYSBC at 130P unless noted. See also MetaGroupFaqs?


The summer meeting of the New York Structural Biology discussion group will be held August 4.


Grants

NIH awards $1.96M for a Dual-Beam Scanning EM at NYSBC. Congratulations to Prof. Stokes and his co-investigators .
NIH awards $2.309M for the Dynamic Nuclear Polarization NMR proposal at NYSBC. Congratulations to Prof. McDermott and her co-investigators.
NSF awards $3.5M for "Development of a Synchrotron Beamline for High-resolution Microdiffraction Analysis of Biological Macromolecules". Congratulations to Prof. Hendrickson and his co-investigators.


Other



UPDATED

Grant Citations: Please remember to acknowledge NIH supported equipment in any submitted manuscripts: http://www.nysbc.net/twiki/bin/view/Main/SupportStatement

700: The FCNMR high-field field-cycler (HFFC), a belt driven shuttle device, has been installed. The spectrometer is still available for standard non-shuttled experiments. The only difference though is the eject air is no longer used to insert sample in the magnet. This function is now done using the shuttle, it requires the use of unbroken shigemi or 7" standard tubes. Because of mechanical limitations 8" or 9" standard tubes or shigemi tubes that are short because of damage cannot be used.




NYSBC Infotech WILL NEVER ASK YOU TO PROVIDE PASSWORD INFORMATION, AND WILL NOT ASK YOU TO OPEN FILES ATTACHED TO EMAILS. PLEASE EXERCISE CARE WITH DECEPTIVE EMAILS

  • NYSBC closed on Federal Holidays -
  • 19 Jun 2026 - Friday, Jun 19 Juneteenth National Independence Day
  • 03 Jul 2026 - Friday, Jul 3 Independence Day (observed)
  • 07 Sep 2026 - Monday, Sep 7 Labor Day


You can get further information on accessing the intranet web pages referenced. If you received this announcement by email, you can link to the current page. You can access and list events external to NYSBC?. This page is emailed to all current affiliates and intranet registered persons on major changes and about 28, 7 and 3 days before events. You can suppress emails to you from this source. You can be notified when this page changes by adding your name to CurrentAnnouncementsGroup

Added:
>
>
CONFLICT version 5:
  * Ge_Zhou_2010_science_Virus.pdf: Ge_Zhou_2010_science_Virus.pdf
Added:
>
>
CONFLICT version new:

CONFLICT end
 
META FILEATTACHMENT attachment="Ge_Zhou_2010_science_Virus.pdf" attr="h" comment="" date="1268667576" name="Ge_Zhou_2010_science_Virus.pdf" path="Ge_Zhou_2010_science_Virus.pdf" size="717365" stream="Ge_Zhou_2010_science_Virus.pdf" user="Main.KdDerr" version="1"

Revision 515 Mar 2010 - Main.KdDerr

 
META TOPICPARENT name="CurrentAnnouncementsNMR"

CUNY excavation. Change of schedules, All hours, late night, weekend, and holiday access.

EM users should be aware of possible Construction Impact until further notice. The detailed look ahead for EM scheduling is at Cem Constructionschedule.

EM Journal Club

  • Mar 25 2010 @ 4PM Paul Gottleib Presents Presents [[http://www.nysbc.net/twiki/pub/Main/CurrentAnnouncementsEM/Ge_Zhou_2010_science_Virus.pdf][Cryo-EM Model of the Bullet-Shaped Vesicular Stomatitis Virus] by Peng Ge, et al. Science 327, 689 (2010)
  • Apr 08 2010 @ 4PM Sacha DeCarlo TBA
  • Apr 22 2010 @ 4PM TBA



Pages with additional details specifically for sort PIs sort NMR Users sort EM Users sort Beam line Users sort External events sort


Meta Group Meetings in next six weeks

Meetings normally held in A-11 NYSBC at 130P unless noted. See also MetaGroupFaqs?


The summer meeting of the New York Structural Biology discussion group will be held August 4.


Grants

NIH awards $1.96M for a Dual-Beam Scanning EM at NYSBC. Congratulations to Prof. Stokes and his co-investigators .
NIH awards $2.309M for the Dynamic Nuclear Polarization NMR proposal at NYSBC. Congratulations to Prof. McDermott and her co-investigators.
NSF awards $3.5M for "Development of a Synchrotron Beamline for High-resolution Microdiffraction Analysis of Biological Macromolecules". Congratulations to Prof. Hendrickson and his co-investigators.


Other



UPDATED

Grant Citations: Please remember to acknowledge NIH supported equipment in any submitted manuscripts: http://www.nysbc.net/twiki/bin/view/Main/SupportStatement

700: The FCNMR high-field field-cycler (HFFC), a belt driven shuttle device, has been installed. The spectrometer is still available for standard non-shuttled experiments. The only difference though is the eject air is no longer used to insert sample in the magnet. This function is now done using the shuttle, it requires the use of unbroken shigemi or 7" standard tubes. Because of mechanical limitations 8" or 9" standard tubes or shigemi tubes that are short because of damage cannot be used.




NYSBC Infotech WILL NEVER ASK YOU TO PROVIDE PASSWORD INFORMATION, AND WILL NOT ASK YOU TO OPEN FILES ATTACHED TO EMAILS. PLEASE EXERCISE CARE WITH DECEPTIVE EMAILS

  • NYSBC closed on Federal Holidays -
  • 19 Jun 2026 - Friday, Jun 19 Juneteenth National Independence Day
  • 03 Jul 2026 - Friday, Jul 3 Independence Day (observed)
  • 07 Sep 2026 - Monday, Sep 7 Labor Day


You can get further information on accessing the intranet web pages referenced. If you received this announcement by email, you can link to the current page. You can access and list events external to NYSBC?. This page is emailed to all current affiliates and intranet registered persons on major changes and about 28, 7 and 3 days before events. You can suppress emails to you from this source. You can be notified when this page changes by adding your name to CurrentAnnouncementsGroup

Added:
>
>
* Ge_Zhou_2010_science_Virus.pdf: Ge_Zhou_2010_science_Virus.pdf

META FILEATTACHMENT attachment="Ge_Zhou_2010_science_Virus.pdf" attr="h" comment="" date="1268667576" name="Ge_Zhou_2010_science_Virus.pdf" path="Ge_Zhou_2010_science_Virus.pdf" size="717365" stream="Ge_Zhou_2010_science_Virus.pdf" user="Main.KdDerr" version="1"
 

Revision 415 Mar 2010 - Main.KdDerr

 
META TOPICPARENT name="CurrentAnnouncementsNMR"

CUNY excavation. Change of schedules, All hours, late night, weekend, and holiday access.

EM users should be aware of possible Construction Impact until further notice. The detailed look ahead for EM scheduling is at Cem Constructionschedule.
Changed:
<
<

>
>

EM Journal Club

Added:
>
>
  • Mar 25 2010 @ 4PM Paul Gottleib Presents Presents [[http://www.nysbc.net/twiki/pub/Main/CurrentAnnouncementsEM/Ge_Zhou_2010_science_Virus.pdf][Cryo-EM Model of the Bullet-Shaped Vesicular Stomatitis Virus] by Peng Ge, et al. Science 327, 689 (2010)
  • Apr 08 2010 @ 4PM Sacha DeCarlo TBA
  • Apr 22 2010 @ 4PM TBA
 
Changed:
<
<
>
>

 
Pages with additional details specifically for sort PIs sort NMR Users sort EM Users sort Beam line Users sort External events sort


Meta Group Meetings in next six weeks

Meetings normally held in A-11 NYSBC at 130P unless noted. See also MetaGroupFaqs?


The summer meeting of the New York Structural Biology discussion group will be held August 4.


Grants

NIH awards $1.96M for a Dual-Beam Scanning EM at NYSBC. Congratulations to Prof. Stokes and his co-investigators .
NIH awards $2.309M for the Dynamic Nuclear Polarization NMR proposal at NYSBC. Congratulations to Prof. McDermott and her co-investigators.
NSF awards $3.5M for "Development of a Synchrotron Beamline for High-resolution Microdiffraction Analysis of Biological Macromolecules". Congratulations to Prof. Hendrickson and his co-investigators.


Other



UPDATED

Grant Citations: Please remember to acknowledge NIH supported equipment in any submitted manuscripts: http://www.nysbc.net/twiki/bin/view/Main/SupportStatement

700: The FCNMR high-field field-cycler (HFFC), a belt driven shuttle device, has been installed. The spectrometer is still available for standard non-shuttled experiments. The only difference though is the eject air is no longer used to insert sample in the magnet. This function is now done using the shuttle, it requires the use of unbroken shigemi or 7" standard tubes. Because of mechanical limitations 8" or 9" standard tubes or shigemi tubes that are short because of damage cannot be used.




NYSBC Infotech WILL NEVER ASK YOU TO PROVIDE PASSWORD INFORMATION, AND WILL NOT ASK YOU TO OPEN FILES ATTACHED TO EMAILS. PLEASE EXERCISE CARE WITH DECEPTIVE EMAILS

  • NYSBC closed on Federal Holidays -
  • 19 Jun 2026 - Friday, Jun 19 Juneteenth National Independence Day
  • 03 Jul 2026 - Friday, Jul 3 Independence Day (observed)
  • 07 Sep 2026 - Monday, Sep 7 Labor Day


You can get further information on accessing the intranet web pages referenced. If you received this announcement by email, you can link to the current page. You can access and list events external to NYSBC?. This page is emailed to all current affiliates and intranet registered persons on major changes and about 28, 7 and 3 days before events. You can suppress emails to you from this source. You can be notified when this page changes by adding your name to CurrentAnnouncementsGroup

Revision 315 Mar 2010 - Main.KdDerr

 
META TOPICPARENT name="CurrentAnnouncementsNMR"

CUNY excavation. Change of schedules, All hours, late night, weekend, and holiday access.

Changed:
<
<
EM users should be aware of possible Construction Impact until further notice. The detailed lookahead for EM scheduling is at Cem Constructionschedule.
>
>
EM users should be aware of possible Construction Impact until further notice. The detailed look ahead for EM scheduling is at Cem Constructionschedule.
 


Pages with additional details specifically for sort PIs sort NMR Users sort EM Users sort Beam line Users sort External events sort


Meta Group Meetings in next six weeks

Meetings normally held in A-11 NYSBC at 130P unless noted. See also MetaGroupFaqs?


The summer meeting of the New York Structural Biology discussion group will be held August 4.


Grants

NIH awards $1.96M for a Dual-Beam Scanning EM at NYSBC. Congratulations to Prof. Stokes and his co-investigators .
NIH awards $2.309M for the Dynamic Nuclear Polarization NMR proposal at NYSBC. Congratulations to Prof. McDermott and her co-investigators.
NSF awards $3.5M for "Development of a Synchrotron Beamline for High-resolution Microdiffraction Analysis of Biological Macromolecules". Congratulations to Prof. Hendrickson and his co-investigators.


Other



UPDATED

Grant Citations: Please remember to acknowledge NIH supported equipment in any submitted manuscripts: http://www.nysbc.net/twiki/bin/view/Main/SupportStatement

700: The FCNMR high-field field-cycler (HFFC), a belt driven shuttle device, has been installed. The spectrometer is still available for standard non-shuttled experiments. The only difference though is the eject air is no longer used to insert sample in the magnet. This function is now done using the shuttle, it requires the use of unbroken shigemi or 7" standard tubes. Because of mechanical limitations 8" or 9" standard tubes or shigemi tubes that are short because of damage cannot be used.




NYSBC Infotech WILL NEVER ASK YOU TO PROVIDE PASSWORD INFORMATION, AND WILL NOT ASK YOU TO OPEN FILES ATTACHED TO EMAILS. PLEASE EXERCISE CARE WITH DECEPTIVE EMAILS

  • NYSBC closed on Federal Holidays -
  • 19 Jun 2026 - Friday, Jun 19 Juneteenth National Independence Day
  • 03 Jul 2026 - Friday, Jul 3 Independence Day (observed)
  • 07 Sep 2026 - Monday, Sep 7 Labor Day


You can get further information on accessing the intranet web pages referenced. If you received this announcement by email, you can link to the current page. You can access and list events external to NYSBC?. This page is emailed to all current affiliates and intranet registered persons on major changes and about 28, 7 and 3 days before events. You can suppress emails to you from this source. You can be notified when this page changes by adding your name to CurrentAnnouncementsGroup

Revision 202 Oct 2009 - Main.DavidCowburn

 
META TOPICPARENT name="CurrentAnnouncementsNMR"
Added:
>
>

CUNY excavation. Change of schedules, All hours, late night, weekend, and holiday access.

EM users should be aware of possible Construction Impact until further notice. The detailed lookahead for EM scheduling is at Cem Constructionschedule.


 


Pages with additional details specifically for sort PIs sort NMR Users sort EM Users sort Beam line Users sort External events sort


Meta Group Meetings in next six weeks

Meetings normally held in A-11 NYSBC at 130P unless noted. See also MetaGroupFaqs?


The summer meeting of the New York Structural Biology discussion group will be held August 4.


Grants

NIH awards $1.96M for a Dual-Beam Scanning EM at NYSBC. Congratulations to Prof. Stokes and his co-investigators .
NIH awards $2.309M for the Dynamic Nuclear Polarization NMR proposal at NYSBC. Congratulations to Prof. McDermott and her co-investigators.
NSF awards $3.5M for "Development of a Synchrotron Beamline for High-resolution Microdiffraction Analysis of Biological Macromolecules". Congratulations to Prof. Hendrickson and his co-investigators.


Other



UPDATED

Grant Citations: Please remember to acknowledge NIH supported equipment in any submitted manuscripts: http://www.nysbc.net/twiki/bin/view/Main/SupportStatement

700: The FCNMR high-field field-cycler (HFFC), a belt driven shuttle device, has been installed. The spectrometer is still available for standard non-shuttled experiments. The only difference though is the eject air is no longer used to insert sample in the magnet. This function is now done using the shuttle, it requires the use of unbroken shigemi or 7" standard tubes. Because of mechanical limitations 8" or 9" standard tubes or shigemi tubes that are short because of damage cannot be used.




NYSBC Infotech WILL NEVER ASK YOU TO PROVIDE PASSWORD INFORMATION, AND WILL NOT ASK YOU TO OPEN FILES ATTACHED TO EMAILS. PLEASE EXERCISE CARE WITH DECEPTIVE EMAILS

  • NYSBC closed on Federal Holidays -
  • 19 Jun 2026 - Friday, Jun 19 Juneteenth National Independence Day
  • 03 Jul 2026 - Friday, Jul 3 Independence Day (observed)
  • 07 Sep 2026 - Monday, Sep 7 Labor Day


You can get further information on accessing the intranet web pages referenced. If you received this announcement by email, you can link to the current page. You can access and list events external to NYSBC?. This page is emailed to all current affiliates and intranet registered persons on major changes and about 28, 7 and 3 days before events. You can suppress emails to you from this source. You can be notified when this page changes by adding your name to CurrentAnnouncementsGroup

Revision 102 Oct 2009 - Main.DavidCowburn

 
META TOPICPARENT name="CurrentAnnouncementsNMR"


Pages with additional details specifically for sort PIs sort NMR Users sort EM Users sort Beam line Users sort External events sort


Meta Group Meetings in next six weeks

Meetings normally held in A-11 NYSBC at 130P unless noted. See also MetaGroupFaqs?


The summer meeting of the New York Structural Biology discussion group will be held August 4.


Grants

NIH awards $1.96M for a Dual-Beam Scanning EM at NYSBC. Congratulations to Prof. Stokes and his co-investigators .
NIH awards $2.309M for the Dynamic Nuclear Polarization NMR proposal at NYSBC. Congratulations to Prof. McDermott and her co-investigators.
NSF awards $3.5M for "Development of a Synchrotron Beamline for High-resolution Microdiffraction Analysis of Biological Macromolecules". Congratulations to Prof. Hendrickson and his co-investigators.


Other



UPDATED

Grant Citations: Please remember to acknowledge NIH supported equipment in any submitted manuscripts: http://www.nysbc.net/twiki/bin/view/Main/SupportStatement

700: The FCNMR high-field field-cycler (HFFC), a belt driven shuttle device, has been installed. The spectrometer is still available for standard non-shuttled experiments. The only difference though is the eject air is no longer used to insert sample in the magnet. This function is now done using the shuttle, it requires the use of unbroken shigemi or 7" standard tubes. Because of mechanical limitations 8" or 9" standard tubes or shigemi tubes that are short because of damage cannot be used.




NYSBC Infotech WILL NEVER ASK YOU TO PROVIDE PASSWORD INFORMATION, AND WILL NOT ASK YOU TO OPEN FILES ATTACHED TO EMAILS. PLEASE EXERCISE CARE WITH DECEPTIVE EMAILS

  • NYSBC closed on Federal Holidays -
  • 19 Jun 2026 - Friday, Jun 19 Juneteenth National Independence Day
  • 03 Jul 2026 - Friday, Jul 3 Independence Day (observed)
  • 07 Sep 2026 - Monday, Sep 7 Labor Day


You can get further information on accessing the intranet web pages referenced. If you received this announcement by email, you can link to the current page. You can access and list events external to NYSBC?. This page is emailed to all current affiliates and intranet registered persons on major changes and about 28, 7 and 3 days before events. You can suppress emails to you from this source. You can be notified when this page changes by adding your name to CurrentAnnouncementsGroup

 
Copyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding this intranet, Send feedback