Difference:
DentonEvaporator
(1 vs. 2)
Revision 2
19 Jan 2015 - Main.BillRice
META TOPICPARENT
name="CryoSP"
Contents
Standard Operating Procedure
Coating of resin-embedded samples attached to stubs
Standard Operating Procedure
Coating of resin-embedded samples attached to stubs
Turn on machine (switch on back)
Open chamber
Put sample(s) in stage, noting position
close chamber
Press System Start
Press Screens
Press Manual Sputter
Turn pump on by pressing "Mech Pump Off" button
Open pump valve (vertical = OPEN; horizontal = CLOSED)
System should pump to <100 mTorr within 2 minutes
Open Argon tank valve
Open gas valve by pressing "Gas Valve Off"
Vacuum will immediately degrade to ~700 mTorr then recover
Wait for vacuum to get between 50 and 50 mtorr (may need to adjust gas opening valve)
Set current to 25 mA
Turn on rotation
Turn on current. Time with timer for 5 minutes
turn off current
Turn off gas valve
Close Argon gas valve
turn off rotation
Close mechanical pump valve (horizontal position)
Changed:
<
<
Open pump ballast valve to equalize pressure
>
>
Open pump ballast valve to equalize pressure. Leave open for ~10s, then close
Turn off mechanical pump
Set ALLOWTOPICVIEW =
--
BillRice
- 19 Jan 2015
Revision 1
19 Jan 2015 - Main.BillRice
META TOPICPARENT
name="CryoSP"
Contents
Standard Operating Procedure
Coating of resin-embedded samples attached to stubs
Standard Operating Procedure
Coating of resin-embedded samples attached to stubs
Turn on machine (switch on back)
Open chamber
Put sample(s) in stage, noting position
close chamber
Press System Start
Press Screens
Press Manual Sputter
Turn pump on by pressing "Mech Pump Off" button
Open pump valve (vertical = OPEN; horizontal = CLOSED)
System should pump to <100 mTorr within 2 minutes
Open Argon tank valve
Open gas valve by pressing "Gas Valve Off"
Vacuum will immediately degrade to ~700 mTorr then recover
Wait for vacuum to get between 50 and 50 mtorr (may need to adjust gas opening valve)
Set current to 25 mA
Turn on rotation
Turn on current. Time with timer for 5 minutes
turn off current
Turn off gas valve
Close Argon gas valve
turn off rotation
Close mechanical pump valve (horizontal position)
Open pump ballast valve to equalize pressure
Turn off mechanical pump
Set ALLOWTOPICVIEW =
--
BillRice
- 19 Jan 2015
View topic
|
H
istory
:
r3
<
r2
<
r1
|
More topic actions...
Copyright
© by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding this intranet,
Send feedback