Difference:
MainTenance6m
(4 vs. 5)
Revision 5
27 Aug 2009 - Main.KdDerr
META TOPICPARENT
name="CemstaffCalendars"
Contents
Maintenance Instructions for 6 Month Items
Maintenance Instructions for 6 Month Items
Added:
>
>
Vacuum Vents on UPS Units
2 units in phase III hallway
F20 UPS
F20 PM
Call FEI to open service call 1-800-432-1734 Serial #D934
JEOL Microscope PM's
Call or email Tim Gilbert 1-800-253-5365 or
service2@jeol.com
Replace Diaphrams on Gatan Dry Pumping Station
Service only pumping station at the same time. Make sure at least one is working.
You will need:
Gatan hex key set from drawers below 2100 pumping station
Gatan MVP 015 Service Kit #08503
11mm (pump removal) and 14mm (filter removal) crescent wrenches
Remove Black ring from opening to Turbo pump
Remove blue cover
Cover opening of turbo pump with tin foil
Remove 4 hex screws on both sides of MVP
Clean all 6 surfaces of the plates
Unscrew diaphragms on each side
Make sure new diaphragms are tightly secured or they will strip the arms of the pump requiring a pump replacement.
Set ALLOWTOPICVIEW =
--
KdDerr
- 06 Mar 2009
View topic
|
H
istory
:
r5
<
r4
<
r3
<
r2
|
More topic actions...
Copyright
© by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding this intranet,
Send feedback