Maintenance Instructions for 14 day tasks

Week A

Vacuum F20 and 1230 rooms

Regrease O-rings and clean All Microscope Holders

  • Only Use Fomblin Grease and Lint Free cloths
    • JEOL 1230 (1)
    • JEOL 2100 (3)
    • FEI F20 (5)

Fill U-traps on drains with water

  • 2 locations
    • dark room
    • behind dishwasher

Check Vacuum Gauges on on Gatan Dry Pumping Station

  • This is to ensure that the Cold Cathode Gauge is working
  • Should read 10-4 range if pumped overnight
  • If it does not clean the cold cathode gauge:
    • Turn off and unplug pumping station
    • Vent the system
    • Remove gauge by pulling (it is secured by vacuum and an o-ring)
    • Unscrew the black plastic nut on the bottom of the top gauge.
    • Open gauge.
    • Loosen and remove securing plate with two Hex screws
    • Remove pin
    • With the pin will come : 1 o-ring
    • Use a 3M pad to remove contamination from the pin
      • Use caution and prevent moving the small metal igniter its location is critical to the functioning of the gauge.
    • Dust with compressed air.
    • Reassemble the gauge.

Week B

Vacuum 2100 and 3200 rooms

Check Compressed gas tank regulators

  • Open gas tank
  • Observe pressure on right dial of regulator
  • If at or below 500 psi check end of hallway for back up and list on dry erase board
  • 9 compressed gas tanks
    • HPF
    • Ethane
    • Nitrogen for Plunge Freezer
    • CO2 for incubator
    • F20 Film exchange tank
    • 2100 ancillary hallway
    • 3200 ancillary hallway
    • Gatan Solarius gases (Ar, N, and O)

Check oil levels on all Mechanical pumps

  • Observe level and color of oil in all mechanical pumps
  • If oil shows yellow or darkening hue replace. Do not wait until it browns.
  • 8 Locations - 10 pumps
    • BOC Edwards Vacuum Evaporator
    • JEOL Film pumping station - Microscope Suite Hallway
    • F20 Film pumping station - below phase II stairway
    • F20 Mechanical pump
    • 3200 Mechanical pump (2)
    • 2100 Mechanical pump (2)
    • 1230 Mechanical pump (1)
    • Jun-Aire Compressor -1230 Ancillary hallway

Check Chiller water levels

  • Check 5 locations
    • 4 water chillers - one for each microscope
    • Incubator water level - Cell Culture Room

  • Set ALLOWTOPICVIEW =

-- KdDerr - 04 Mar 2009

Added:
>
>
META TOPICMOVED by="DavidCowburn" date="1260756740" from="Main.Maintenance14d:" to="Main.MaintenanceDay14"
 

Revision 1711 Dec 2009 - Main.KdDerr

 
META TOPICPARENT name="CemstaffCalendars"
Contents

Maintenance Instructions for 14 day tasks

Week A

Added:
>
>

Vacuum F20 and 1230 rooms

 

Regrease O-rings and clean All Microscope Holders

  • Only Use Fomblin Grease and Lint Free cloths
    • JEOL 1230 (1)
    • JEOL 2100 (3)
    • FEI F20 (5)

Fill U-traps on drains with water

  • 2 locations
    • dark room
    • behind dishwasher

Check Vacuum Gauges on on Gatan Dry Pumping Station

  • This is to ensure that the Cold Cathode Gauge is working
  • Should read 10-4 range if pumped overnight
  • If it does not clean the cold cathode gauge:
    • Turn off and unplug pumping station
    • Vent the system
    • Remove gauge by pulling (it is secured by vacuum and an o-ring)
    • Unscrew the black plastic nut on the bottom of the top gauge.
    • Open gauge.
    • Loosen and remove securing plate with two Hex screws
    • Remove pin
    • With the pin will come : 1 o-ring
    • Use a 3M pad to remove contamination from the pin
      • Use caution and prevent moving the small metal igniter its location is critical to the functioning of the gauge.
    • Dust with compressed air.
    • Reassemble the gauge.

Week B

Added:
>
>

Vacuum 2100 and 3200 rooms

 

Check Compressed gas tank regulators

  • Open gas tank
  • Observe pressure on right dial of regulator
  • If at or below 500 psi check end of hallway for back up and list on dry erase board
  • 9 compressed gas tanks
    • HPF
    • Ethane
    • Nitrogen for Plunge Freezer
    • CO2 for incubator
    • F20 Film exchange tank
    • 2100 ancillary hallway
    • 3200 ancillary hallway
    • Gatan Solarius gases (Ar, N, and O)

Check oil levels on all Mechanical pumps

  • Observe level and color of oil in all mechanical pumps
  • If oil shows yellow or darkening hue replace. Do not wait until it browns.
  • 8 Locations - 10 pumps
    • BOC Edwards Vacuum Evaporator
    • JEOL Film pumping station - Microscope Suite Hallway
    • F20 Film pumping station - below phase II stairway
    • F20 Mechanical pump
    • 3200 Mechanical pump (2)
    • 2100 Mechanical pump (2)
    • 1230 Mechanical pump (1)
    • Jun-Aire Compressor -1230 Ancillary hallway

Check Chiller water levels

  • Check 5 locations
    • 4 water chillers - one for each microscope
    • Incubator water level - Cell Culture Room

  • Set ALLOWTOPICVIEW =

-- KdDerr - 04 Mar 2009

Revision 1616 Sep 2009 - Main.KdDerr

 
META TOPICPARENT name="CemstaffCalendars"
Contents

Maintenance Instructions for 14 day tasks

Week A

Regrease O-rings and clean All Microscope Holders

  • Only Use Fomblin Grease and Lint Free cloths
    • JEOL 1230 (1)
    • JEOL 2100 (3)
    • FEI F20 (5)
Deleted:
<
<

Check Chiller water levels

  • Check 5 locations
    • 4 water chillers - one for each microscope
    • Incubator water level - Cell Culture Room
 

Fill U-traps on drains with water

  • 2 locations
    • dark room
    • behind dishwasher

Check Vacuum Gauges on on Gatan Dry Pumping Station

  • This is to ensure that the Cold Cathode Gauge is working
  • Should read 10-4 range if pumped overnight
  • If it does not clean the cold cathode gauge:
    • Turn off and unplug pumping station
    • Vent the system
    • Remove gauge by pulling (it is secured by vacuum and an o-ring)
    • Unscrew the black plastic nut on the bottom of the top gauge.
    • Open gauge.
    • Loosen and remove securing plate with two Hex screws
    • Remove pin
    • With the pin will come : 1 o-ring
    • Use a 3M pad to remove contamination from the pin
      • Use caution and prevent moving the small metal igniter its location is critical to the functioning of the gauge.
    • Dust with compressed air.
    • Reassemble the gauge.

Week B

Deleted:
<
<

Package Biohazardous Waste for Thursday pick-up

 

Check Compressed gas tank regulators

  • Open gas tank
  • Observe pressure on right dial of regulator
  • If at or below 500 psi check end of hallway for back up and list on dry erase board
  • 9 compressed gas tanks
    • HPF
    • Ethane
    • Nitrogen for Plunge Freezer
    • CO2 for incubator
    • F20 Film exchange tank
    • 2100 ancillary hallway
    • 3200 ancillary hallway
    • Gatan Solarius gases (Ar, N, and O)

Check oil levels on all Mechanical pumps

  • Observe level and color of oil in all mechanical pumps
  • If oil shows yellow or darkening hue replace. Do not wait until it browns.
  • 8 Locations - 10 pumps
    • BOC Edwards Vacuum Evaporator
    • JEOL Film pumping station - Microscope Suite Hallway
    • F20 Film pumping station - below phase II stairway
    • F20 Mechanical pump
    • 3200 Mechanical pump (2)
    • 2100 Mechanical pump (2)
    • 1230 Mechanical pump (1)
    • Jun-Aire Compressor -1230 Ancillary hallway
Added:
>
>

Check Chiller water levels

  • Check 5 locations
    • 4 water chillers - one for each microscope
    • Incubator water level - Cell Culture Room
 

  • Set ALLOWTOPICVIEW =

-- KdDerr - 04 Mar 2009

Revision 1508 May 2009 - Main.KdDerr

 
META TOPICPARENT name="CemstaffCalendars"
Contents

Maintenance Instructions for 14 day tasks

Week A

Regrease O-rings and clean All Microscope Holders

  • Only Use Fomblin Grease and Lint Free cloths
    • JEOL 1230 (1)
    • JEOL 2100 (3)
    • FEI F20 (5)

Check Chiller water levels

  • Check 5 locations
    • 4 water chillers - one for each microscope
    • Incubator water level - Cell Culture Room
Added:
>
>

Fill U-traps on drains with water

  • 2 locations
    • dark room
    • behind dishwasher
 

Check Vacuum Gauges on on Gatan Dry Pumping Station

  • This is to ensure that the Cold Cathode Gauge is working
  • Should read 10-4 range if pumped overnight
  • If it does not clean the cold cathode gauge:
    • Turn off and unplug pumping station
    • Vent the system
    • Remove gauge by pulling (it is secured by vacuum and an o-ring)
    • Unscrew the black plastic nut on the bottom of the top gauge.
    • Open gauge.
    • Loosen and remove securing plate with two Hex screws
    • Remove pin
    • With the pin will come : 1 o-ring
    • Use a 3M pad to remove contamination from the pin
      • Use caution and prevent moving the small metal igniter its location is critical to the functioning of the gauge.
    • Dust with compressed air.
    • Reassemble the gauge.

Week B

Package Biohazardous Waste for Thursday pick-up

Check Compressed gas tank regulators

  • Open gas tank
  • Observe pressure on right dial of regulator
  • If at or below 500 psi check end of hallway for back up and list on dry erase board
  • 9 compressed gas tanks
    • HPF
    • Ethane
    • Nitrogen for Plunge Freezer
    • CO2 for incubator
    • F20 Film exchange tank
    • 2100 ancillary hallway
    • 3200 ancillary hallway
    • Gatan Solarius gases (Ar, N, and O)

Check oil levels on all Mechanical pumps

  • Observe level and color of oil in all mechanical pumps
  • If oil shows yellow or darkening hue replace. Do not wait until it browns.
  • 8 Locations - 10 pumps
    • BOC Edwards Vacuum Evaporator
    • JEOL Film pumping station - Microscope Suite Hallway
    • F20 Film pumping station - below phase II stairway
    • F20 Mechanical pump
    • 3200 Mechanical pump (2)
    • 2100 Mechanical pump (2)
    • 1230 Mechanical pump (1)
    • Jun-Aire Compressor -1230 Ancillary hallway

  • Set ALLOWTOPICVIEW =

-- KdDerr - 04 Mar 2009

Revision 1403 Apr 2009 - Main.KdDerr

 
META TOPICPARENT name="CemstaffCalendars"
Contents

Maintenance Instructions for 14 day tasks

Week A

Regrease O-rings and clean All Microscope Holders

  • Only Use Fomblin Grease and Lint Free cloths
    • JEOL 1230 (1)
    • JEOL 2100 (3)
    • FEI F20 (5)

Check Chiller water levels

  • Check 5 locations
    • 4 water chillers - one for each microscope
    • Incubator water level - Cell Culture Room
Deleted:
<
<

Check Dark Room Chemicals

 

Check Vacuum Gauges on on Gatan Dry Pumping Station

  • This is to ensure that the Cold Cathode Gauge is working
  • Should read 10-4 range if pumped overnight
  • If it does not clean the cold cathode gauge:
    • Turn off and unplug pumping station
    • Vent the system
    • Remove gauge by pulling (it is secured by vacuum and an o-ring)
    • Unscrew the black plastic nut on the bottom of the top gauge.
    • Open gauge.
    • Loosen and remove securing plate with two Hex screws
    • Remove pin
    • With the pin will come : 1 o-ring
    • Use a 3M pad to remove contamination from the pin
      • Use caution and prevent moving the small metal igniter its location is critical to the functioning of the gauge.
    • Dust with compressed air.
    • Reassemble the gauge.

Week B

Package Biohazardous Waste for Thursday pick-up

Check Compressed gas tank regulators

  • Open gas tank
  • Observe pressure on right dial of regulator
  • If at or below 500 psi check end of hallway for back up and list on dry erase board
  • 9 compressed gas tanks
    • HPF
    • Ethane
    • Nitrogen for Plunge Freezer
    • CO2 for incubator
    • F20 Film exchange tank
    • 2100 ancillary hallway
    • 3200 ancillary hallway
    • Gatan Solarius gases (Ar, N, and O)

Check oil levels on all Mechanical pumps

  • Observe level and color of oil in all mechanical pumps
  • If oil shows yellow or darkening hue replace. Do not wait until it browns.
  • 8 Locations - 10 pumps
    • BOC Edwards Vacuum Evaporator
    • JEOL Film pumping station - Microscope Suite Hallway
    • F20 Film pumping station - below phase II stairway
    • F20 Mechanical pump
    • 3200 Mechanical pump (2)
    • 2100 Mechanical pump (2)
    • 1230 Mechanical pump (1)
    • Jun-Aire Compressor -1230 Ancillary hallway

  • Set ALLOWTOPICVIEW =

-- KdDerr - 04 Mar 2009

Revision 1311 Mar 2009 - Main.BillRice

 
META TOPICPARENT name="CemstaffCalendars"
Contents

Maintenance Instructions for 14 day tasks

Week A

Regrease O-rings and clean All Microscope Holders

  • Only Use Fomblin Grease and Lint Free cloths
    • JEOL 1230 (1)
    • JEOL 2100 (3)
    • FEI F20 (5)

Check Chiller water levels

  • Check 5 locations
    • 4 water chillers - one for each microscope
    • Incubator water level - Cell Culture Room

Check Dark Room Chemicals

Deleted:
<
<

Back up 2100 and 3200 Microscope Computers

 

Check Vacuum Gauges on on Gatan Dry Pumping Station

  • This is to ensure that the Cold Cathode Gauge is working
  • Should read 10-4 range if pumped overnight
  • If it does not clean the cold cathode gauge:
    • Turn off and unplug pumping station
    • Vent the system
    • Remove gauge by pulling (it is secured by vacuum and an o-ring)
    • Unscrew the black plastic nut on the bottom of the top gauge.
    • Open gauge.
    • Loosen and remove securing plate with two Hex screws
    • Remove pin
    • With the pin will come : 1 o-ring
    • Use a 3M pad to remove contamination from the pin
      • Use caution and prevent moving the small metal igniter its location is critical to the functioning of the gauge.
    • Dust with compressed air.
    • Reassemble the gauge.

Week B

Package Biohazardous Waste for Thursday pick-up

Check Compressed gas tank regulators

  • Open gas tank
  • Observe pressure on right dial of regulator
  • If at or below 500 psi check end of hallway for back up and list on dry erase board
  • 9 compressed gas tanks
    • HPF
    • Ethane
    • Nitrogen for Plunge Freezer
    • CO2 for incubator
    • F20 Film exchange tank
    • 2100 ancillary hallway
    • 3200 ancillary hallway
    • Gatan Solarius gases (Ar, N, and O)

Check oil levels on all Mechanical pumps

  • Observe level and color of oil in all mechanical pumps
  • If oil shows yellow or darkening hue replace. Do not wait until it browns.
  • 8 Locations - 10 pumps
    • BOC Edwards Vacuum Evaporator
    • JEOL Film pumping station - Microscope Suite Hallway
    • F20 Film pumping station - below phase II stairway
    • F20 Mechanical pump
    • 3200 Mechanical pump (2)
    • 2100 Mechanical pump (2)
    • 1230 Mechanical pump (1)
    • Jun-Aire Compressor -1230 Ancillary hallway
Deleted:
<
<

Back up 1230 and F20 Microscope Computers

 

  • Set ALLOWTOPICVIEW =

-- KdDerr - 04 Mar 2009

Revision 1211 Mar 2009 - Main.KdDerr

 
META TOPICPARENT name="CemstaffCalendars"
Contents

Maintenance Instructions for 14 day tasks

Week A

Added:
>
>

Regrease O-rings and clean All Microscope Holders

  • Only Use Fomblin Grease and Lint Free cloths
    • JEOL 1230 (1)
    • JEOL 2100 (3)
    • FEI F20 (5)
 

Check Chiller water levels

  • Check 5 locations
    • 4 water chillers - one for each microscope
    • Incubator water level - Cell Culture Room

Check Dark Room Chemicals

Back up 2100 and 3200 Microscope Computers

Deleted:
<
<

Package Biohazardous Waste for Thursday pick-up

 

Check Vacuum Gauges on on Gatan Dry Pumping Station

  • This is to ensure that the Cold Cathode Gauge is working
  • Should read 10-4 range if pumped overnight
  • If it does not clean the cold cathode gauge:
    • Turn off and unplug pumping station
    • Vent the system
    • Remove gauge by pulling (it is secured by vacuum and an o-ring)
    • Unscrew the black plastic nut on the bottom of the top gauge.
    • Open gauge.
    • Loosen and remove securing plate with two Hex screws
    • Remove pin
    • With the pin will come : 1 o-ring
    • Use a 3M pad to remove contamination from the pin
      • Use caution and prevent moving the small metal igniter its location is critical to the functioning of the gauge.
    • Dust with compressed air.
    • Reassemble the gauge.

Week B

Changed:
<
<

Regrease O-rings and clean All Microscope Holders

>
>

Package Biohazardous Waste for Thursday pick-up

Deleted:
<
<
  • Only Use Fomblin Grease and Lint Free cloths
    • JEOL 1230 (1)
    • JEOL 2100 (3)
    • FEI F20 (5)
 

Check Compressed gas tank regulators

  • Open gas tank
  • Observe pressure on right dial of regulator
  • If at or below 500 psi check end of hallway for back up and list on dry erase board
  • 9 compressed gas tanks
    • HPF
    • Ethane
    • Nitrogen for Plunge Freezer
    • CO2 for incubator
    • F20 Film exchange tank
    • 2100 ancillary hallway
    • 3200 ancillary hallway
    • Gatan Solarius gases (Ar, N, and O)

Check oil levels on all Mechanical pumps

  • Observe level and color of oil in all mechanical pumps
  • If oil shows yellow or darkening hue replace. Do not wait until it browns.
  • 8 Locations - 10 pumps
    • BOC Edwards Vacuum Evaporator
    • JEOL Film pumping station - Microscope Suite Hallway
    • F20 Film pumping station - below phase II stairway
    • F20 Mechanical pump
    • 3200 Mechanical pump (2)
    • 2100 Mechanical pump (2)
    • 1230 Mechanical pump (1)
    • Jun-Aire Compressor -1230 Ancillary hallway

Back up 1230 and F20 Microscope Computers

  • Set ALLOWTOPICVIEW =

-- KdDerr - 04 Mar 2009

Revision 1109 Mar 2009 - Main.KdDerr

 
META TOPICPARENT name="CemstaffCalendars"
Contents

Maintenance Instructions for 14 day tasks

Week A

Check Chiller water levels

  • Check 5 locations
    • 4 water chillers - one for each microscope
    • Incubator water level - Cell Culture Room

Check Dark Room Chemicals

Back up 2100 and 3200 Microscope Computers

Package Biohazardous Waste for Thursday pick-up

Check Vacuum Gauges on on Gatan Dry Pumping Station

  • This is to ensure that the Cold Cathode Gauge is working
  • Should read 10-4 range if pumped overnight
  • If it does not clean the cold cathode gauge:
    • Turn off and unplug pumping station
    • Vent the system
    • Remove gauge by pulling (it is secured by vacuum and an o-ring)
    • Unscrew the black plastic nut on the bottom of the top gauge.
    • Open gauge.
    • Loosen and remove securing plate with two Hex screws
    • Remove pin
    • With the pin will come : 1 o-ring
    • Use a 3M pad to remove contamination from the pin
Changed:
<
<
      • Use caution and prevent moving the small metal igniter its location is critical to the functioning of the gauge.
>
>
      • Use caution and prevent moving the small metal igniter its location is critical to the functioning of the gauge.
 
    • Dust with compressed air.
    • Reassemble the gauge.

Week B

Regrease O-rings and clean All Microscope Holders

  • Only Use Fomblin Grease and Lint Free cloths
    • JEOL 1230 (1)
    • JEOL 2100 (3)
    • FEI F20 (5)

Check Compressed gas tank regulators

  • Open gas tank
  • Observe pressure on right dial of regulator
  • If at or below 500 psi check end of hallway for back up and list on dry erase board
  • 9 compressed gas tanks
    • HPF
    • Ethane
    • Nitrogen for Plunge Freezer
    • CO2 for incubator
    • F20 Film exchange tank
    • 2100 ancillary hallway
    • 3200 ancillary hallway
    • Gatan Solarius gases (Ar, N, and O)

Check oil levels on all Mechanical pumps

  • Observe level and color of oil in all mechanical pumps
  • If oil shows yellow or darkening hue replace. Do not wait until it browns.
  • 8 Locations - 10 pumps
    • BOC Edwards Vacuum Evaporator
    • JEOL Film pumping station - Microscope Suite Hallway
    • F20 Film pumping station - below phase II stairway
    • F20 Mechanical pump
    • 3200 Mechanical pump (2)
    • 2100 Mechanical pump (2)
    • 1230 Mechanical pump (1)
    • Jun-Aire Compressor -1230 Ancillary hallway

Back up 1230 and F20 Microscope Computers

  • Set ALLOWTOPICVIEW =

-- KdDerr - 04 Mar 2009

Revision 1009 Mar 2009 - Main.KdDerr

 
META TOPICPARENT name="CemstaffCalendars"
Contents

Maintenance Instructions for 14 day tasks

Week A

Check Chiller water levels

  • Check 5 locations
    • 4 water chillers - one for each microscope
    • Incubator water level - Cell Culture Room

Check Dark Room Chemicals

Back up 2100 and 3200 Microscope Computers

Package Biohazardous Waste for Thursday pick-up

Check Vacuum Gauges on on Gatan Dry Pumping Station

  • This is to ensure that the Cold Cathode Gauge is working
  • Should read 10-4 range if pumped overnight
  • If it does not clean the cold cathode gauge:
    • Turn off and unplug pumping station
    • Vent the system
    • Remove gauge by pulling (it is secured by vacuum and an o-ring)
    • Unscrew the black plastic nut on the bottom of the top gauge.
    • Open gauge.
    • Loosen and remove securing plate with two Hex screws
    • Remove pin
    • With the pin will come : 1 o-ring
    • Use a 3M pad to remove contamination from the pin
Added:
>
>
      • Use caution and prevent moving the small metal igniter its location is critical to the functioning of the gauge.
 
    • Dust with compressed air.
    • Reassemble the gauge.

Week B

Regrease O-rings and clean All Microscope Holders

  • Only Use Fomblin Grease and Lint Free cloths
    • JEOL 1230 (1)
    • JEOL 2100 (3)
    • FEI F20 (5)

Check Compressed gas tank regulators

  • Open gas tank
  • Observe pressure on right dial of regulator
  • If at or below 500 psi check end of hallway for back up and list on dry erase board
  • 9 compressed gas tanks
    • HPF
    • Ethane
    • Nitrogen for Plunge Freezer
    • CO2 for incubator
    • F20 Film exchange tank
    • 2100 ancillary hallway
    • 3200 ancillary hallway
    • Gatan Solarius gases (Ar, N, and O)

Check oil levels on all Mechanical pumps

  • Observe level and color of oil in all mechanical pumps
  • If oil shows yellow or darkening hue replace. Do not wait until it browns.
  • 8 Locations - 10 pumps
    • BOC Edwards Vacuum Evaporator
    • JEOL Film pumping station - Microscope Suite Hallway
    • F20 Film pumping station - below phase II stairway
    • F20 Mechanical pump
    • 3200 Mechanical pump (2)
    • 2100 Mechanical pump (2)
    • 1230 Mechanical pump (1)
    • Jun-Aire Compressor -1230 Ancillary hallway

Back up 1230 and F20 Microscope Computers

  • Set ALLOWTOPICVIEW =

-- KdDerr - 04 Mar 2009

Revision 909 Mar 2009 - Main.KdDerr

 
META TOPICPARENT name="CemstaffCalendars"
Contents

Maintenance Instructions for 14 day tasks

Week A

Check Chiller water levels

  • Check 5 locations
    • 4 water chillers - one for each microscope
    • Incubator water level - Cell Culture Room

Check Dark Room Chemicals

Back up 2100 and 3200 Microscope Computers

Package Biohazardous Waste for Thursday pick-up

Added:
>
>

Check Vacuum Gauges on on Gatan Dry Pumping Station

  • This is to ensure that the Cold Cathode Gauge is working
  • Should read 10-4 range if pumped overnight
  • If it does not clean the cold cathode gauge:
    • Turn off and unplug pumping station
    • Vent the system
    • Remove gauge by pulling (it is secured by vacuum and an o-ring)
    • Unscrew the black plastic nut on the bottom of the top gauge.
    • Open gauge.
    • Loosen and remove securing plate with two Hex screws
    • Remove pin
    • With the pin will come : 1 o-ring
    • Use a 3M pad to remove contamination from the pin
    • Dust with compressed air.
    • Reassemble the gauge.
 

Week B

Regrease O-rings and clean All Microscope Holders

  • Only Use Fomblin Grease and Lint Free cloths
    • JEOL 1230 (1)
    • JEOL 2100 (3)
    • FEI F20 (5)

Check Compressed gas tank regulators

  • Open gas tank
  • Observe pressure on right dial of regulator
  • If at or below 500 psi check end of hallway for back up and list on dry erase board
  • 9 compressed gas tanks
    • HPF
    • Ethane
    • Nitrogen for Plunge Freezer
    • CO2 for incubator
    • F20 Film exchange tank
    • 2100 ancillary hallway
    • 3200 ancillary hallway
    • Gatan Solarius gases (Ar, N, and O)

Check oil levels on all Mechanical pumps

  • Observe level and color of oil in all mechanical pumps
  • If oil shows yellow or darkening hue replace. Do not wait until it browns.
  • 8 Locations - 10 pumps
    • BOC Edwards Vacuum Evaporator
    • JEOL Film pumping station - Microscope Suite Hallway
    • F20 Film pumping station - below phase II stairway
    • F20 Mechanical pump
    • 3200 Mechanical pump (2)
    • 2100 Mechanical pump (2)
    • 1230 Mechanical pump (1)
    • Jun-Aire Compressor -1230 Ancillary hallway

Back up 1230 and F20 Microscope Computers

  • Set ALLOWTOPICVIEW =

-- KdDerr - 04 Mar 2009

Revision 809 Mar 2009 - Main.KdDerr

 
META TOPICPARENT name="CemstaffCalendars"
Contents

Maintenance Instructions for 14 day tasks

Week A

Check Chiller water levels

  • Check 5 locations
    • 4 water chillers - one for each microscope
    • Incubator water level - Cell Culture Room

Check Dark Room Chemicals

Back up 2100 and 3200 Microscope Computers

Package Biohazardous Waste for Thursday pick-up

Week B

Regrease O-rings and clean All Microscope Holders

Changed:
<
<
  • JEOL 1230 (1)
  • JEOL 2100 (3)
  • FEI F20 (5)
>
>
  • Only Use Fomblin Grease and Lint Free cloths
    • JEOL 1230 (1)
    • JEOL 2100 (3)
Added:
>
>
    • FEI F20 (5)
 

Check Compressed gas tank regulators

  • Open gas tank
  • Observe pressure on right dial of regulator
  • If at or below 500 psi check end of hallway for back up and list on dry erase board
  • 9 compressed gas tanks
    • HPF
    • Ethane
    • Nitrogen for Plunge Freezer
    • CO2 for incubator
    • F20 Film exchange tank
    • 2100 ancillary hallway
    • 3200 ancillary hallway
    • Gatan Solarius gases (Ar, N, and O)

Check oil levels on all Mechanical pumps

  • Observe level and color of oil in all mechanical pumps
  • If oil shows yellow or darkening hue replace. Do not wait until it browns.
  • 8 Locations - 10 pumps
    • BOC Edwards Vacuum Evaporator
    • JEOL Film pumping station - Microscope Suite Hallway
    • F20 Film pumping station - below phase II stairway
    • F20 Mechanical pump
    • 3200 Mechanical pump (2)
    • 2100 Mechanical pump (2)
    • 1230 Mechanical pump (1)
    • Jun-Aire Compressor -1230 Ancillary hallway

Back up 1230 and F20 Microscope Computers

  • Set ALLOWTOPICVIEW =

-- KdDerr - 04 Mar 2009

Revision 709 Mar 2009 - Main.KdDerr

 
META TOPICPARENT name="CemstaffCalendars"
Contents

Maintenance Instructions for 14 day tasks

Week A

Check Chiller water levels

  • Check 5 locations
    • 4 water chillers - one for each microscope
    • Incubator water level - Cell Culture Room

Check Dark Room Chemicals

Back up 2100 and 3200 Microscope Computers

Package Biohazardous Waste for Thursday pick-up

Week B

Added:
>
>

Regrease O-rings and clean All Microscope Holders

  • JEOL 1230 (1)
  • JEOL 2100 (3)
  • FEI F20 (5)
 

Check Compressed gas tank regulators

  • Open gas tank
  • Observe pressure on right dial of regulator
  • If at or below 500 psi check end of hallway for back up and list on dry erase board
  • 9 compressed gas tanks
    • HPF
    • Ethane
    • Nitrogen for Plunge Freezer
    • CO2 for incubator
    • F20 Film exchange tank
    • 2100 ancillary hallway
    • 3200 ancillary hallway
    • Gatan Solarius gases (Ar, N, and O)

Check oil levels on all Mechanical pumps

  • Observe level and color of oil in all mechanical pumps
  • If oil shows yellow or darkening hue replace. Do not wait until it browns.
  • 8 Locations - 10 pumps
    • BOC Edwards Vacuum Evaporator
    • JEOL Film pumping station - Microscope Suite Hallway
    • F20 Film pumping station - below phase II stairway
    • F20 Mechanical pump
    • 3200 Mechanical pump (2)
    • 2100 Mechanical pump (2)
    • 1230 Mechanical pump (1)
    • Jun-Aire Compressor -1230 Ancillary hallway

Back up 1230 and F20 Microscope Computers

  • Set ALLOWTOPICVIEW =

-- KdDerr - 04 Mar 2009

Revision 606 Mar 2009 - Main.KdDerr

 
META TOPICPARENT name="CemstaffCalendars"
Contents

Maintenance Instructions for 14 day tasks

Changed:
<
<

Back up Microscope Computers

Check Compressed gas tank regulators

>
>

Week A

Check Chiller water levels

Added:
>
>
  • Check 5 locations
    • 4 water chillers - one for each microscope
    • Incubator water level - Cell Culture Room

Check Dark Room Chemicals

Back up 2100 and 3200 Microscope Computers

Package Biohazardous Waste for Thursday pick-up

Week B

Check Compressed gas tank regulators

 
  • Open gas tank
  • Observe pressure on right dial of regulator
  • If at or below 500 psi check end of hallway for back up and list on dry erase board
  • 9 compressed gas tanks
    • HPF
    • Ethane
    • Nitrogen for Plunge Freezer
    • CO2 for incubator
    • F20 Film exchange tank
    • 2100 ancillary hallway
    • 3200 ancillary hallway
    • Gatan Solarius gases (Ar, N, and O)
Changed:
<
<
>
>

Check oil levels on all Mechanical pumps

Deleted:
<
<

Check oil levels on all Mechanical pumps

 
  • Observe level and color of oil in all mechanical pumps
  • If oil shows yellow or darkening hue replace. Do not wait until it browns.
  • 8 Locations - 10 pumps
    • BOC Edwards Vacuum Evaporator
    • JEOL Film pumping station - Microscope Suite Hallway
    • F20 Film pumping station - below phase II stairway
    • F20 Mechanical pump
    • 3200 Mechanical pump (2)
    • 2100 Mechanical pump (2)
    • 1230 Mechanical pump (1)
    • Jun-Aire Compressor -1230 Ancillary hallway
Changed:
<
<

Check Dark Room Chemicals

>
>

Back up 1230 and F20 Microscope Computers

 
Changed:
<
<

Check Chiller water levels

>
>
Deleted:
<
<
  • Check 5 locations
    • 4 water chillers - one for each microscope
    • Incubator water level - Cell Culture Room
 

  • Set ALLOWTOPICVIEW =

-- KdDerr - 04 Mar 2009

Revision 505 Mar 2009 - Main.KdDerr

 
META TOPICPARENT name="CemstaffCalendars"
Contents

Maintenance Instructions for 14 day tasks

Added:
>
>

Back up Microscope Computers

 

Check Compressed gas tank regulators

  • Open gas tank
  • Observe pressure on right dial of regulator
  • If at or below 500 psi check end of hallway for back up and list on dry erase board
  • 9 compressed gas tanks
    • HPF
    • Ethane
    • Nitrogen for Plunge Freezer
    • CO2 for incubator
    • F20 Film exchange tank
    • 2100 ancillary hallway
    • 3200 ancillary hallway
    • Gatan Solarius gases (Ar, N, and O)

Check oil levels on all Mechanical pumps

  • Observe level and color of oil in all mechanical pumps
  • If oil shows yellow or darkening hue replace. Do not wait until it browns.
  • 8 Locations - 10 pumps
    • BOC Edwards Vacuum Evaporator
    • JEOL Film pumping station - Microscope Suite Hallway
    • F20 Film pumping station - below phase II stairway
    • F20 Mechanical pump
    • 3200 Mechanical pump (2)
    • 2100 Mechanical pump (2)
    • 1230 Mechanical pump (1)
    • Jun-Aire Compressor -1230 Ancillary hallway

Check Dark Room Chemicals

Check Chiller water levels

  • Check 5 locations
    • 4 water chillers - one for each microscope
    • Incubator water level - Cell Culture Room

  • Set ALLOWTOPICVIEW =

-- KdDerr - 04 Mar 2009

Revision 404 Mar 2009 - Main.KdDerr

 
META TOPICPARENT name="CemstaffCalendars"
Contents

Maintenance Instructions for 14 day tasks

Check Compressed gas tank regulators

  • Open gas tank
  • Observe pressure on right dial of regulator
  • If at or below 500 psi check end of hallway for back up and list on dry erase board
  • 9 compressed gas tanks
    • HPF
    • Ethane
    • Nitrogen for Plunge Freezer
    • CO2 for incubator
    • F20 Film exchange tank
    • 2100 ancillary hallway
    • 3200 ancillary hallway
    • Gatan Solarius gases (Ar, N, and O)

Check oil levels on all Mechanical pumps

  • Observe level and color of oil in all mechanical pumps
  • If oil shows yellow or darkening hue replace. Do not wait until it browns.
  • 8 Locations - 10 pumps
    • BOC Edwards Vacuum Evaporator
    • JEOL Film pumping station - Microscope Suite Hallway
    • F20 Film pumping station - below phase II stairway
    • F20 Mechanical pump
    • 3200 Mechanical pump (2)
    • 2100 Mechanical pump (2)
    • 1230 Mechanical pump (1)
    • Jun-Aire Compressor -1230 Ancillary hallway

Check Dark Room Chemicals

Check Chiller water levels

  • Check 5 locations
    • 4 water chillers - one for each microscope
Changed:
<
<
    • Incubator water level
>
>
    • Incubator water level - Cell Culture Room
 

  • Set ALLOWTOPICVIEW =

-- KdDerr - 04 Mar 2009

Revision 304 Mar 2009 - Main.KdDerr

 
META TOPICPARENT name="CemstaffCalendars"
Contents

Maintenance Instructions for 14 day tasks

Check Compressed gas tank regulators

  • Open gas tank
  • Observe pressure on right dial of regulator
  • If at or below 500 psi check end of hallway for back up and list on dry erase board
  • 9 compressed gas tanks
    • HPF
    • Ethane
    • Nitrogen for Plunge Freezer
    • CO2 for incubator
    • F20 Film exchange tank
Changed:
<
<
    • 2100 ancillary hallway
    • 3200 ancillary hallway
>
>
    • 2100 ancillary hallway
    • 3200 ancillary hallway
 
    • Gatan Solarius gases (Ar, N, and O)

Check oil levels on all Mechanical pumps

  • Observe level and color of oil in all mechanical pumps
  • If oil shows yellow or darkening hue replace. Do not wait until it browns.
Changed:
<
<
  • 7 Locations
>
>
  • 8 Locations - 10 pumps
 
    • BOC Edwards Vacuum Evaporator
    • JEOL Film pumping station - Microscope Suite Hallway
    • F20 Film pumping station - below phase II stairway
    • F20 Mechanical pump
Changed:
<
<
    • 3200 Mechanical pump
    • 2100 Mechanical pump
    • 1230 Mechanical pump
>
>
    • 3200 Mechanical pump (2)
    • 2100 Mechanical pump (2)
    • 1230 Mechanical pump (1)
    • Jun-Aire Compressor -1230 Ancillary hallway
 

Check Dark Room Chemicals

Check Chiller water levels

  • Check 5 locations
    • 4 water chillers - one for each microscope
    • Incubator water level

  • Set ALLOWTOPICVIEW =

-- KdDerr - 04 Mar 2009

Revision 204 Mar 2009 - Main.KdDerr

 
META TOPICPARENT name="CemstaffCalendars"
Contents

Maintenance Instructions for 14 day tasks

Check Compressed gas tank regulators

  • Open gas tank
  • Observe pressure on right dial of regulator
  • If at or below 500 psi check end of hallway for back up and list on dry erase board
  • 9 compressed gas tanks
    • HPF
    • Ethane
    • Nitrogen for Plunge Freezer
    • CO2 for incubator
    • F20 Film exchange tank
    • 2100 ancillary hallway
    • 3200 ancillary hallway
    • Gatan Solarius gases (Ar, N, and O)
Added:
>
>
 

Check oil levels on all Mechanical pumps

  • Observe level and color of oil in all mechanical pumps
  • If oil shows yellow or darkening hue replace. Do not wait until it browns.
Added:
>
>
  • 7 Locations
    • BOC Edwards Vacuum Evaporator
    • JEOL Film pumping station - Microscope Suite Hallway
    • F20 Film pumping station - below phase II stairway
    • F20 Mechanical pump
    • 3200 Mechanical pump
    • 2100 Mechanical pump
    • 1230 Mechanical pump
 

Check Dark Room Chemicals

Added:
>
>
 

Check Chiller water levels

  • Check 5 locations
    • 4 water chillers - one for each microscope
    • Incubator water level

  • Set ALLOWTOPICVIEW =

-- KdDerr - 04 Mar 2009

Revision 104 Mar 2009 - Main.KdDerr

 
META TOPICPARENT name="CemstaffCalendars"
Contents

Maintenance Instructions for 14 day tasks

Check Compressed gas tank regulators

  • Open gas tank
  • Observe pressure on right dial of regulator
  • If at or below 500 psi check end of hallway for back up and list on dry erase board
  • 9 compressed gas tanks
    • HPF
    • Ethane
    • Nitrogen for Plunge Freezer
    • CO2 for incubator
    • F20 Film exchange tank
    • 2100 ancillary hallway
    • 3200 ancillary hallway
    • Gatan Solarius gases (Ar, N, and O)

Check oil levels on all Mechanical pumps

  • Observe level and color of oil in all mechanical pumps
  • If oil shows yellow or darkening hue replace. Do not wait until it browns.

Check Dark Room Chemicals

Check Chiller water levels

  • Check 5 locations
    • 4 water chillers - one for each microscope
    • Incubator water level