Contents
NYSBC Power SHutdown 9/16 - 9/19ALL STAFFIt is expected that most HVAC and other circuits will go off 5 pm Friday. You should have all work cease before then, and leave the building. Only the on-schedule staff will then be permitted to enter before power is restored. On Monday, it is expected that power will be restored before 9 am. This should be evident by restoration of the phone system. If power is NOT restored, only the on-schedule staff will be permitted to enter until power is restored.Emergency Generator
Emergency GeneratorSafety SecurityStarr: Will one guard be enough to provide suficient coverage, while power is out?
HVACYork: Message to Mike McHugh? re controls and AHU shutdowns.Telephone System | ||||||||||||||||
| Changed: | ||||||||||||||||
| < < | Per Kris Halpern of PhoneExtra?, power down expansion unit, then main processor, power up main processor, then expansion unit. | |||||||||||||||
| > > | Per Kris Halpern of PhoneExtra?, power down expansion unit, then main processor,Then UPS, power up the UPS, then main processor, then expansion unit. This system was backed up on 9/14. | |||||||||||||||
NMR Facility Shutdown.
Air compressor shudown.
Water chiller.
InfotechTo prepare for the electrical shutdown, Infotech plans to take the following steps to ensure a smooth transition. Please feel free to add any comments.
Equipment Start OrderComputer services will be restored in the following order -
| ||||||||||||||||