NYSBC Power SHutdown 9/16 - 9/19ALL STAFFIt is expected that most HVAC and other circuits will go off 5 pm Friday. You should have all work cease before then, and leave the building. Only the on-schedule staff will then be permitted to enter before power is restored. On Monday, it is expected that power will be restored before 9 am. This should be evident by restoration of the phone system. If power is NOT restored, only the on-schedule staff will be permitted to enter until power is restored.Emergency Generator | ||||||||
| Changed: | ||||||||
| < < |
| |||||||
| > > |
| |||||||
Emergency GeneratorSafety SecurityStarr: Will one guard be enough to provide suficient coverage, while power is out? | ||||||||
| Changed: | ||||||||
| < < |
| |||||||
| > > |
| |||||||
Briscoe: fax memo to be forwarded to central station. Anna will pass along info to technicians for callback 8/29.
ADT: Dan Kelly on vac. Call for sub on 9/26
HVACYork: Message to Mike McHugh? re controls and AHU shutdowns.Telephone SystemPer Kris Halpern of PhoneExtra?, power down expansion unit, then main processor,Then UPS, power up the UPS, then main processor, then expansion unit. This system was backed up on 9/14.NMR Facility Shutdown. | ||||||||
| Changed: | ||||||||
| < < |
| |||||||
| > > |
| |||||||
Air compressor shudown. | ||||||||
| Changed: | ||||||||
| < < |
| |||||||
| > > |
| |||||||
Water chiller. | ||||||||
| Changed: | ||||||||
| < < |
| |||||||
| > > |
| |||||||
| ||||||||
| Changed: | ||||||||
| < < |
| |||||||
| > > |
| |||||||
InfotechTo prepare for the electrical shutdown, Infotech plans to take the following steps to ensure a smooth transition. Please feel free to add any comments. | ||||||||
| Changed: | ||||||||
| < < |
| |||||||
| > > |
| |||||||
Equipment Start OrderComputer services will be restored in the following order - | ||||||||
| Changed: | ||||||||
| < < |
| |||||||
| > > |
| |||||||
| GG original | ||||||||
| Changed: | ||||||||
| < < | Normally a server attempts delivery of an e-mail for 72 hours, after which it is bounced back to the sender. Since the equipment will be powered off for more than 72 hours, to prevent messages sent to nysbc from being returned to the sender, Infotech will arrange for a mail backup service, where all mail addressed to nysbc will be held until the equipment is powered up. Once power has been restored, all messages will be forwarded to our mail server. DC suggestion. Best to advise if mail is not delivered. Expected outage is Fri 5 pm through Mon noon, close to 72 h. Suggest email restoration is top restart item Monday and that backup not be used. | |||||||
| > > | Normally a server attempts delivery of an e-mail for 72 hours, after which it is bounced back to the sender. Since the equipment will be powered off for more than 72 hours, to prevent messages sent to nysbc from being returned to the sender, Infotech will arrange for a mail backup service, where all mail addressed to nysbc will be held until the equipment is powered up. Once power has been restored, all messages will be forwarded to our mail server. DC suggestion. Best to advise if mail is not delivered. Expected outage is Fri 5 pm through Mon noon, close to 72 h. Suggest email restoration is top restart item Monday and that backup not be used. | |||||||
| I would like to recommend that all outgoing messages contain a disclaimer stating the times that mailserver will be down and that messages will not be responded to for the time that the server is down. The mailbackup service will not deliver messages to other accounts, so all the forwarders set up on the mail server will not work. Regards, Dhiresh. | ||||||||
| Changed: | ||||||||
| < < |
| |||||||
| > > |
| |||||||
-- DhireshVyas - 13 Sep 2005
| ||||||||
| Added: | ||||||||
| > > |
| |||||||
Contents
NYSBC Power SHutdown 9/16 - 9/19ALL STAFFIt is expected that most HVAC and other circuits will go off 5 pm Friday. You should have all work cease before then, and leave the building. Only the on-schedule staff will then be permitted to enter before power is restored. On Monday, it is expected that power will be restored before 9 am. This should be evident by restoration of the phone system. If power is NOT restored, only the on-schedule staff will be permitted to enter until power is restored.Emergency Generator
Emergency GeneratorSafety SecurityStarr: Will one guard be enough to provide suficient coverage, while power is out?
HVACYork: Message to Mike McHugh? re controls and AHU shutdowns.Telephone SystemPer Kris Halpern of PhoneExtra?, power down expansion unit, then main processor,Then UPS, power up the UPS, then main processor, then expansion unit. This system was backed up on 9/14.NMR Facility Shutdown.
Air compressor shudown.
Water chiller.
InfotechTo prepare for the electrical shutdown, Infotech plans to take the following steps to ensure a smooth transition. Please feel free to add any comments.
Equipment Start OrderComputer services will be restored in the following order -
| ||||||||||||||||
| Added: | ||||||||||||||||
| > > |
| |||||||||||||||
Contents
NYSBC Power SHutdown 9/16 - 9/19ALL STAFFIt is expected that most HVAC and other circuits will go off 5 pm Friday. You should have all work cease before then, and leave the building. Only the on-schedule staff will then be permitted to enter before power is restored. On Monday, it is expected that power will be restored before 9 am. This should be evident by restoration of the phone system. If power is NOT restored, only the on-schedule staff will be permitted to enter until power is restored.Emergency Generator
Emergency GeneratorSafety SecurityStarr: Will one guard be enough to provide suficient coverage, while power is out?
HVACYork: Message to Mike McHugh? re controls and AHU shutdowns.Telephone System | ||||||||||||||||
| Changed: | ||||||||||||||||
| < < | Per Kris Halpern of PhoneExtra?, power down expansion unit, then main processor, power up main processor, then expansion unit. | |||||||||||||||
| > > | Per Kris Halpern of PhoneExtra?, power down expansion unit, then main processor,Then UPS, power up the UPS, then main processor, then expansion unit. This system was backed up on 9/14. | |||||||||||||||
NMR Facility Shutdown.
Air compressor shudown.
Water chiller.
InfotechTo prepare for the electrical shutdown, Infotech plans to take the following steps to ensure a smooth transition. Please feel free to add any comments.
Equipment Start OrderComputer services will be restored in the following order -
| ||||||||||||||||
Contents
NYSBC Power SHutdown 9/16 - 9/19ALL STAFFIt is expected that most HVAC and other circuits will go off 5 pm Friday. You should have all work cease before then, and leave the building. Only the on-schedule staff will then be permitted to enter before power is restored. On Monday, it is expected that power will be restored before 9 am. This should be evident by restoration of the phone system. If power is NOT restored, only the on-schedule staff will be permitted to enter until power is restored.Emergency Generator
| ||||||||||||||||
| Added: | ||||||||||||||||
| > > | Emergency Generator | |||||||||||||||
Safety SecurityStarr: Will one guard be enough to provide suficient coverage, while power is out?
HVACYork: Message to Mike McHugh? re controls and AHU shutdowns. | ||||||||||||||||
| Added: | ||||||||||||||||
| > > | Telephone SystemPer Kris Halpern of PhoneExtra?, power down expansion unit, then main processor, power up main processor, then expansion unit. | |||||||||||||||
NMR Facility Shutdown.
Air compressor shudown.
Water chiller.
InfotechTo prepare for the electrical shutdown, Infotech plans to take the following steps to ensure a smooth transition. Please feel free to add any comments.
Equipment Start OrderComputer services will be restored in the following order -
| ||||||||||||||||
Contents
NYSBC Power SHutdown 9/16 - 9/19ALL STAFFIt is expected that most HVAC and other circuits will go off 5 pm Friday. You should have all work cease before then, and leave the building. Only the on-schedule staff will then be permitted to enter before power is restored. On Monday, it is expected that power will be restored before 9 am. This should be evident by restoration of the phone system. If power is NOT restored, only the on-schedule staff will be permitted to enter until power is restored.Emergency Generator
| ||||||||||||||||
| Changed: | ||||||||||||||||
| < < |
| |||||||||||||||
| > > |
| |||||||||||||||
Safety SecurityStarr: Will one guard be enough to provide suficient coverage, while power is out?
HVACYork: Message to Mike McHugh? re controls and AHU shutdowns.NMR Facility Shutdown.
Air compressor shudown.
Water chiller.
InfotechTo prepare for the electrical shutdown, Infotech plans to take the following steps to ensure a smooth transition. Please feel free to add any comments.
Equipment Start OrderComputer services will be restored in the following order -
| ||||||||||||||||
| Changed: | ||||||||||||||||
| < < | -- DhireshVyas - 13 Sep 2005 | |||||||||||||||
| > > | -- DhireshVyas - 13 Sep 2005 | |||||||||||||||
| Deleted: | ||||||||||||||||
| < < | ||||||||||||||||
Contents
NYSBC Power SHutdown 9/16 - 9/19ALL STAFFIt is expected that most HVAC and other circuits will go off 5 pm Friday. You should have all work cease before then, and leave the building. Only the on-schedule staff will then be permitted to enter before power is restored. On Monday, it is expected that power will be restored before 9 am. This should be evident by restoration of the phone system. If power is NOT restored, only the on-schedule staff will be permitted to enter until power is restored.Emergency Generator
Safety SecurityStarr: Will one guard be enough to provide suficient coverage, while power is out?
HVACYork: Message to Mike McHugh? re controls and AHU shutdowns.NMR Facility Shutdown.
Air compressor shudown.
Water chiller.
InfotechTo prepare for the electrical shutdown, Infotech plans to take the following steps to ensure a smooth transition. Please feel free to add any comments.
| ||||||||||||||||
| Added: | ||||||||||||||||
| > > | Equipment Start OrderComputer services will be restored in the following order -
| |||||||||||||||
GG original
Normally a server attempts delivery of an e-mail for 72 hours, after which it is bounced back to the sender. Since the equipment will be powered off for more than 72 hours, to prevent messages sent to nysbc from being returned to the sender, Infotech will arrange for a mail backup service, where all mail addressed to nysbc will be held until the equipment is powered up. Once power has been restored, all messages will be forwarded to our mail server. DC suggestion. Best to advise if mail is not delivered. Expected outage is Fri 5 pm through Mon noon, close to 72 h. Suggest email restoration is top restart item Monday and that backup not be used.
I would like to recommend that all outgoing messages contain a disclaimer stating the times that mailserver will be down and that messages will not be responded to for the time that the server is down.
The mailbackup service will not deliver messages to other accounts, so all the forwarders set up on the mail server will not work.
Regards,
Dhiresh.
| ||||||||||||||||
| Changed: | ||||||||||||||||
| < < | -- JasperShahn - 26 Aug 2005 | |||||||||||||||
| > > | -- DhireshVyas - 13 Sep 2005 | |||||||||||||||
| Added: | ||||||||||||||||
| > > | ||||||||||||||||
Contents
NYSBC Power SHutdown 9/16 - 9/19ALL STAFFIt is expected that most HVAC and other circuits will go off 5 pm Friday. You should have all work cease before then, and leave the building. Only the on-schedule staff will then be permitted to enter before power is restored. On Monday, it is expected that power will be restored before 9 am. This should be evident by restoration of the phone system. If power is NOT restored, only the on-schedule staff will be permitted to enter until power is restored.Emergency Generator
Safety SecurityStarr: Will one guard be enough to provide suficient coverage, while power is out? | ||||||||||||||||
| Changed: | ||||||||||||||||
| < < |
| |||||||||||||||
| > > |
| |||||||||||||||
HVACYork: Message to Mike McHugh? re controls and AHU shutdowns.NMR Facility Shutdown.
Air compressor shudown.
Water chiller.
InfotechTo prepare for the electrical shutdown, Infotech plans to take the following steps to ensure a smooth transition. Please feel free to add any comments.
| ||||||||||||||||
Contents
NYSBC Power SHutdown 9/16 - 9/19ALL STAFFIt is expected that most HVAC and other circuits will go off 5 pm Friday. You should have all work cease before then, and leave the building. Only the on-schedule staff will then be permitted to enter before power is restored. On Monday, it is expected that power will be restored before 9 am. This should be evident by restoration of the phone system. If power is NOT restored, only the on-schedule staff will be permitted to enter until power is restored.Emergency Generator
Safety SecurityStarr: Will one guard be enough to provide suficient coverage, while power is out?
HVACYork: Message to Mike McHugh? re controls and AHU shutdowns.NMR Facility Shutdown.
Air compressor shudown.
Water chiller.
InfotechTo prepare for the electrical shutdown, Infotech plans to take the following steps to ensure a smooth transition. Please feel free to add any comments. | ||||||||||||||||
| Changed: | ||||||||||||||||
| < < | 1. On Thursday, Sept 15, start a full backup of the servers and office pcs to tape. The tapes will be taken offsite. 2. On Friday, Sept 16, initiate a shutdown of all the servers and network equipment. Call the T1 line provider to inform them of the situation. 3. All users will need to power off their PCs, a walkthrough will be required to ensure that all equipment is shut down and unplugged from outlets to prevent damage from power spikes. 4. The following items will be taken offsite - | |||||||||||||||
| > > |
| |||||||||||||||
| Deleted: | ||||||||||||||||
| < < | i. Backup Tapes - including catalog. ii. Operating system drive from the Data Server 5. When power has been restored, we need to start a specific sequence of powering up the equipment. | |||||||||||||||
GG original
Normally a server attempts delivery of an e-mail for 72 hours, after which it is bounced back to the sender. Since the equipment will be powered off for more than 72 hours, to prevent messages sent to nysbc from being returned to the sender, Infotech will arrange for a mail backup service, where all mail addressed to nysbc will be held until the equipment is powered up. Once power has been restored, all messages will be forwarded to our mail server. DC suggestion. Best to advise if mail is not delivered. Expected outage is Fri 5 pm through Mon noon, close to 72 h. Suggest email restoration is top restart item Monday and that backup not be used.
I would like to recommend that all outgoing messages contain a disclaimer stating the times that mailserver will be down and that messages will not be responded to for the time that the server is down.
The mailbackup service will not deliver messages to other accounts, so all the forwarders set up on the mail server will not work.
Regards,
Dhiresh.
| ||||||||||||||||
Contents
NYSBC Power SHutdown 9/16 - 9/19 | ||||||||||||||||
| Added: | ||||||||||||||||
| > > | ALL STAFFIt is expected that most HVAC and other circuits will go off 5 pm Friday. You should have all work cease before then, and leave the building. Only the on-schedule staff will then be permitted to enter before power is restored. On Monday, it is expected that power will be restored before 9 am. This should be evident by restoration of the phone system. If power is NOT restored, only the on-schedule staff will be permitted to enter until power is restored. | |||||||||||||||
Emergency Generator
| ||||||||||||||||
| Changed: | ||||||||||||||||
| < < |
| |||||||||||||||
| > > |
| |||||||||||||||
Safety Security | ||||||||||||||||
| Changed: | ||||||||||||||||
| < < | Starr: Will on guard be enough to provide suffiecent coverage, while power is out?
| |||||||||||||||
| > > | Starr: Will one guard be enough to provide suficient coverage, while power is out?
| |||||||||||||||
Briscoe: fax memo to be forwarded to central station. Anna will pass along info to technicians for callback 8/29.
ADT: Dan Kelly on vac. Call for sub on 9/26
HVACYork: Message to Mike McHugh? re controls and AHU shutdowns.NMR Facility Shutdown.
Air compressor shudown.
Water chiller.
| ||||||||||||||||
| Added: | ||||||||||||||||
| > > |
| |||||||||||||||
InfotechTo prepare for the electrical shutdown, Infotech plans to take the following steps to ensure a smooth transition. Please feel free to add any comments. 1. On Thursday, Sept 15, start a full backup of the servers and office pcs to tape. The tapes will be taken offsite. 2. On Friday, Sept 16, initiate a shutdown of all the servers and network equipment. Call the T1 line provider to inform them of the situation. | ||||||||||||||||
| Changed: | ||||||||||||||||
| < < | 3. All users will need to power off their PCs, a walkthrough will be required to ensure that all equipment is shut down and unplugged from outlets to prevent | |||||||||||||||
| > > | 3. All users will need to power off their PCs, a walkthrough will be required to ensure that all equipment is shut down and unplugged from outlets to prevent damage from power spikes. | |||||||||||||||
| Deleted: | ||||||||||||||||
| < < | damage from power spikes. | |||||||||||||||
| 4. The following items will be taken offsite - i. Backup Tapes - including catalog. ii. Operating system drive from the Data Server 5. When power has been restored, we need to start a specific sequence of powering up the equipment. | ||||||||||||||||
| Changed: | ||||||||||||||||
| < < | Normally a server attempts delivery of an e-mail for 72 hours, after which it is bounced back to the sender. Since the equipment will be powered off for more than 72 hours, to prevent messages sent to nysbc from being returned to the sender, Infotech will arrange for a mail backup service, where all mail addressed to nysbc will be held until the equipment is powered up. Once power has been restored, all messages will be forwarded to our mail server. | |||||||||||||||
| > > | GG original | |||||||||||||||
| Added: | ||||||||||||||||
| > > | Normally a server attempts delivery of an e-mail for 72 hours, after which it is bounced back to the sender. Since the equipment will be powered off for more than 72 hours, to prevent messages sent to nysbc from being returned to the sender, Infotech will arrange for a mail backup service, where all mail addressed to nysbc will be held until the equipment is powered up. Once power has been restored, all messages will be forwarded to our mail server. DC suggestion. Best to advise if mail is not delivered. Expected outage is Fri 5 pm through Mon noon, close to 72 h. Suggest email restoration is top restart item Monday and that backup not be used. | |||||||||||||||
I would like to recommend that all outgoing messages contain a disclaimer stating the times that mailserver will be down and that messages will not be responded to for the time that the server is down.
The mailbackup service will not deliver messages to other accounts, so all the forwarders set up on the mail server will not work.
Regards,
Dhiresh.
| ||||||||||||||||
Contents
NYSBC Power SHutdown 9/16 - 9/19Emergency Generator
Safety SecurityStarr: Will on guard be enough to provide suffiecent coverage, while power is out?
HVACYork: Message to Mike McHugh? re controls and AHU shutdowns.NMR Facility Shutdown.
Air compressor shudown.
Water chiller.
InfotechTo prepare for the electrical shutdown, Infotech plans to take the following steps to ensure a smooth transition. Please feel free to add any comments. 1. On Thursday, Sept 15, start a full backup of the servers and office pcs to tape. The tapes will be taken offsite. 2. On Friday, Sept 16, initiate a shutdown of all the servers and network equipment. Call the T1 line provider to inform them of the situation. 3. All users will need to power off their PCs, a walkthrough will be required to ensure that all equipment is shut down and unplugged from outlets to prevent damage from power spikes. 4. The following items will be taken offsite - i. Backup Tapes - including catalog. ii. Operating system drive from the Data Server 5. When power has been restored, we need to start a specific sequence of powering up the equipment. Normally a server attempts delivery of an e-mail for 72 hours, after which it is bounced back to the sender. Since the equipment will be powered off for more than 72 hours, to prevent messages sent to nysbc from being returned to the sender, Infotech will arrange for a mail backup service, where all mail addressed to nysbc will be held until the equipment is powered up. Once power has been restored, all messages will be forwarded to our mail server. I would like to recommend that all outgoing messages contain a disclaimer stating the times that mailserver will be down and that messages will not be responded to for the time that the server is down. The mailbackup service will not deliver messages to other accounts, so all the forwarders set up on the mail server will not work. Regards, Dhiresh.
|
Contents
NYSBC Power SHutdown 9/16 - 9/19Emergency Generator
Safety SecurityStarr: Will on guard be enough to provide suffiecent coverage, while power is out?
HVACYork: Message to Mike McHugh? re controls and AHU shutdowns.NMR Facility Shutdown.
Air compressor shudown.
Water chiller.
| ||||||||
| Added: | ||||||||
| > > | InfotechTo prepare for the electrical shutdown, Infotech plans to take the following steps to ensure a smooth transition. Please feel free to add any comments. 1. On Thursday, Sept 15, start a full backup of the servers and office pcs to tape. The tapes will be taken offsite. 2. On Friday, Sept 16, initiate a shutdown of all the servers and network equipment. Call the T1 line provider to inform them of the situation. | |||||||
| Added: | ||||||||
| > > | 3. All users will need to power off their PCs, a walkthrough will be required to ensure that all equipment is shut down and unplugged from outlets to prevent damage from power spikes. 4. The following items will be taken offsite - i. Backup Tapes - including catalog. ii. Operating system drive from the Data Server 5. When power has been restored, we need to start a specific sequence of powering up the equipment. Normally a server attempts delivery of an e-mail for 72 hours, after which it is bounced back to the sender. Since the equipment will be powered off for more than 72 hours, to prevent messages sent to nysbc from being returned to the sender, Infotech will arrange for a mail backup service, where all mail addressed to nysbc will be held until the equipment is powered up. Once power has been restored, all messages will be forwarded to our mail server. I would like to recommend that all outgoing messages contain a disclaimer stating the times that mailserver will be down and that messages will not be responded to for the time that the server is down. The mailbackup service will not deliver messages to other accounts, so all the forwarders set up on the mail server will not work. Regards, Dhiresh. | |||||||
| ||||||||
Contents
NYSBC Power SHutdown 9/16 - 9/19Emergency Generator
| ||||||||
| Changed: | ||||||||
| < < |
| |||||||
| > > |
| |||||||
Safety SecurityStarr: Will on guard be enough to provide suffiecent coverage, while power is out?
HVACYork: Message to Mike McHugh? re controls and AHU shutdowns.NMR Facility Shutdown.
Air compressor shudown.
Water chiller.
| ||||||||
Contents
NYSBC Power SHutdown 9/16 - 9/19Emergency Generator
| ||||||||
| Added: | ||||||||
| > > |
| |||||||
Safety SecurityStarr: Will on guard be enough to provide suffiecent coverage, while power is out?
HVACYork: Message to Mike McHugh? re controls and AHU shutdowns.NMR Facility Shutdown.
Air compressor shudown.
Water chiller.
| ||||||||
Contents
NYSBC Power SHutdown 9/16 - 9/19 | ||||||||
| Added: | ||||||||
| > > | Emergency Generator
| |||||||
Safety Security | ||||||||
| Added: | ||||||||
| > > | Starr: Will on guard be enough to provide suffiecent coverage, while power is out?
| |||||||
| Briscoe: fax memo to be forwarded to central station. Anna will pass along info to technicians for callback 8/29. ADT: Dan Kelly on vac. Call for sub on 9/26 | ||||||||
| Added: | ||||||||
| > > | HVAC | |||||||
| York: Message to Mike McHugh? re controls and AHU shutdowns. | ||||||||
| Changed: | ||||||||
| < < | subsub level topic | |||||||
| > > | NMR Facility Shutdown. | |||||||
| Added: | ||||||||
| > > |
Air compressor shudown.
Water chiller.
| |||||||
| ||||||||
Contents