900 spectrometers at NYSBCWarning: Can't find topic StatuS900num2 Status of 900_1
STATUS: in production | |||||||||||
| DATE | COMMENT |
|---|---|
| For previous closed issues, see earlier versions of this page | |
| Sept. 2 | Open Issue: Line shape stability test is not yet met. For this test the lineshape is monitored in an un-locked state. As this is followed a drift in Z1 is monitored. With autoshim on the drift in Z1 can be corrected during the experiment. Bruker has been contacted about this issue and we are working with them to resolve it. |
| Sept. 2 | Open Issue: Autoshim has a random failure when used with gradient experiment. This issue is linke to the issue above, as autoshim is required to maintain Z1. Again we have contacted Bruker to resolve this issue. |
| 051001 | Open Issue: Discussion with B-BIO-CH about the limitations of power in the 900 cryoprobe |
| META FILEATTACHMENT | attr="" autoattached="1" comment="Schett message confirming shipment" date="1144161380" name="900MHzCryoProbeDelivery.msg" path="900MHzCryoProbeDelivery.msg" size="26112" user="DavidCowburn" version="1.1" |
|---|---|
| META FILEATTACHMENT | attr="" autoattached="1" comment="confirmation of Late Oct deliver " date="1144161380" name="Updateon900US2delivery.txt" path="Updateon900US2delivery.txt" size="448" user="DavidCowburn" version="1.1" |
| META FILEATTACHMENT | attr="" autoattached="1" comment="Schett message confirming shipment" date="1144161380" name="900MHzCryoProbeDelivery.msg" path="900MHzCryoProbeDelivery.msg" size="26112" user="Main.DavidCowburn" version="1.1" |
|---|---|
| META FILEATTACHMENT | attr="" autoattached="1" comment="confirmation of Late Oct deliver " date="1144161380" name="Updateon900US2delivery.txt" path="Updateon900US2delivery.txt" size="448" user="Main.DavidCowburn" version="1.1" |
| META TOPICMOVED | by="DavidCowburn" date="1251901511" from="Main.StatuS900" to="Staffarchive.StatuS900" |
|---|
900 spectrometers at NYSBCWarning: Can't find topic StatuS900num2 Status of 900_1
STATUS: in production | |||||||||||||||||
| DATE | COMMENT |
|---|---|
| For previous closed issues, see earlier versions of this page | |
| Sept. 2 | Open Issue: Line shape stability test is not yet met. For this test the lineshape is monitored in an un-locked state. As this is followed a drift in Z1 is monitored. With autoshim on the drift in Z1 can be corrected during the experiment. Bruker has been contacted about this issue and we are working with them to resolve it. |
| Sept. 2 | Open Issue: Autoshim has a random failure when used with gradient experiment. This issue is linke to the issue above, as autoshim is required to maintain Z1. Again we have contacted Bruker to resolve this issue. |
| 051001 | Open Issue: Discussion with B-BIO-CH about the limitations of power in the 900 cryoprobe |
| META FILEATTACHMENT | attr="" autoattached="1" comment="Schett message confirming shipment" date="1144161380" name="900MHzCryoProbeDelivery.msg" path="900MHzCryoProbeDelivery.msg" size="26112" user="DavidCowburn" version="1.1" |
|---|---|
| META FILEATTACHMENT | attr="" autoattached="1" comment="confirmation of Late Oct deliver " date="1144161380" name="Updateon900US2delivery.txt" path="Updateon900US2delivery.txt" size="448" user="DavidCowburn" version="1.1" |
| Changed: | |||||||||||||||
| < < |
| ||||||||||||||
| > > |
| ||||||||||||||
10 Jun 2026
Contents:
900 spectrometers at NYSBCWarning: Can't find topic StatuS900num2 Status of 900_1
STATUS: in production | |||||||||||||||
| DATE | COMMENT |
|---|---|
| For previous closed issues, see earlier versions of this page | |
| Sept. 2 | Open Issue: Line shape stability test is not yet met. For this test the lineshape is monitored in an un-locked state. As this is followed a drift in Z1 is monitored. With autoshim on the drift in Z1 can be corrected during the experiment. Bruker has been contacted about this issue and we are working with them to resolve it. |
| Sept. 2 | Open Issue: Autoshim has a random failure when used with gradient experiment. This issue is linke to the issue above, as autoshim is required to maintain Z1. Again we have contacted Bruker to resolve this issue. |
| 051001 | Open Issue: Discussion with B-BIO-CH about the limitations of power in the 900 cryoprobe |
| META FILEATTACHMENT | attr="" autoattached="1" comment="Schett message confirming shipment" date="1144161380" name="900MHzCryoProbeDelivery.msg" path="900MHzCryoProbeDelivery.msg" size="26112" user="DavidCowburn" version="1.1" |
|---|---|
| META FILEATTACHMENT | attr="" autoattached="1" comment="confirmation of Late Oct deliver " date="1144161380" name="Updateon900US2delivery.txt" path="Updateon900US2delivery.txt" size="448" user="DavidCowburn" version="1.1" |
900 spectrometers at NYSBCWarning: Can't find topic StatuS900num2 Status of 900_1
STATUS: in production | |||||||||||||||
| Changed: | |||||||||||||||
| < < |
| ||||||||||||||
| > > |
| ||||||||||||||
The magnet is at field at 900.27 MHz, and is cryoshimmed. It is stable. Various console issues are being pursued.
| |||||||||||||||
| |||||||||||
| Changed: | |||||||||||
| < < | 900 spectrometers at NYSBCWarning: Can't find topic NysbC900num2 | ||||||||||
| > > | 900 spectrometers at NYSBCWarning: Can't find topic StatuS900num2 | ||||||||||
| Changed: | |||||||||||
| < < | Status of 900_1 | ||||||||||
| > > | Status of 900_1 | ||||||||||
STATUS: in production
| |||||||||||
| Changed: | |||||||||||
| < < | The magnet is at field at 900.27 MHz, and is cryoshimmed. It is stable. Various console issues are being pursued. | ||||||||||
| > > | The magnet is at field at 900.27 MHz, and is cryoshimmed. It is stable. Various console issues are being pursued. | ||||||||||
| |||||||||||
| Added: | |||||||||||
| > > | -- DavidCowburn? - 07 Sep 2004 | ||||||||||
| Deleted: | |||||||||||
| < < | -- DavidCowburn - 07 Sep 2004 | ||||||||||
| Deleted: | |||||||||||
| < < | |||||||||||
| |||||||||||
| |||||||||||||||||||||||
| Changed: | |||||||||||||||||||||||
| < < | 10 Jun 2026
Contents:
900 spectrometers at NYSBCStatus of 900#1 %9% MHz NMR system at NYSBC: Updated 10 Jun 2026STATUS: in production
The magnet is at field at 900.27 MHz, and is cryoshimmed. It is stable. Various console issues are being pursued.
| ||||||||||||||||||||||
| > > | 10 Jun 2026
Contents:
900 spectrometers at NYSBCWarning: Can't find topic NysbC900num2 Status of 900_1
STATUS: in production | ||||||||||||||||||||||
| DATE | COMMENT |
|---|---|
| For previous closed issues, see earlier versions of this page | |
| Sept. 2 | Open Issue: Line shape stability test is not yet met. For this test the lineshape is monitored in an un-locked state. As this is followed a drift in Z1 is monitored. With autoshim on the drift in Z1 can be corrected during the experiment. Bruker has been contacted about this issue and we are working with them to resolve it. |
| Sept. 2 | Open Issue: Autoshim has a random failure when used with gradient experiment. This issue is linke to the issue above, as autoshim is required to maintain Z1. Again we have contacted Bruker to resolve this issue. |
| 051001 | Open Issue: Discussion with B-BIO-CH about the limitations of power in the 900 cryoprobe |
| META FILEATTACHMENT | attr="" autoattached="1" comment="Schett message confirming shipment" date="1144161380" name="900MHzCryoProbeDelivery.msg" path="900MHzCryoProbeDelivery.msg" size="26112" user="DavidCowburn" version="1.1" |
|---|---|
| META FILEATTACHMENT | attr="" autoattached="1" comment="confirmation of Late Oct deliver " date="1144161380" name="Updateon900US2delivery.txt" path="Updateon900US2delivery.txt" size="448" user="DavidCowburn" version="1.1" |
900 spectrometers at NYSBCStatus of 900#1 %9% MHz NMR system at NYSBC: Updated 10 Jun 2026STATUS: in production | |||||||||||||||||||||||
| Changed: | |||||||||||||||||||||||
| < < |
| ||||||||||||||||||||||
| > > |
| ||||||||||||||||||||||
The magnet is at field at 900.27 MHz, and is cryoshimmed. It is stable. Various console issues are being pursued.
| |||||||||||||||||||||||
900 spectrometers at NYSBCStatus of 900#1 %9% MHz NMR system at NYSBC: Updated 10 Jun 2026STATUS: in production | |||||||||||||||||||||||
| Changed: | |||||||||||||||||||||||
| < < |
| ||||||||||||||||||||||
| > > |
| ||||||||||||||||||||||
The magnet is at field at 900.27 MHz, and is cryoshimmed. It is stable. Various console issues are being pursued.
| |||||||||||||||||||||||
900 spectrometers at NYSBCStatus of 900#1 %9% MHz NMR system at NYSBC: Updated 10 Jun 2026STATUS: in production | |||||||||||||||||||||||
| Changed: | |||||||||||||||||||||||
| < < |
| ||||||||||||||||||||||
| > > |
| ||||||||||||||||||||||
The magnet is at field at 900.27 MHz, and is cryoshimmed. It is stable. Various console issues are being pursued.
| |||||||||||||||||||||||
900 spectrometers at NYSBCStatus of 900#1 %9% MHz NMR system at NYSBC: Updated 10 Jun 2026STATUS: in production | |||||||||||||||||||||||
| Changed: | |||||||||||||||||||||||
| < < |
| ||||||||||||||||||||||
| > > |
| ||||||||||||||||||||||
| Deleted: | |||||||||||||||||||||||
| < < |
| ||||||||||||||||||||||
The magnet is at field at 900.27 MHz, and is cryoshimmed. It is stable. Various console issues are being pursued.
| |||||||||||||||||||||||
900 spectrometers at NYSBCStatus of 900#1 %9% MHz NMR system at NYSBC: Updated 10 Jun 2026STATUS: in production
| |||||||||
| Added: | |||||||||
| > > |
| ||||||||
The magnet is at field at 900.27 MHz, and is cryoshimmed. It is stable. Various console issues are being pursued.
| |||||||||
| Changed: | |||||||||
| < < |
| ||||||||
| > > |
| ||||||||
| Added: | |||||||||
| > > |
| ||||||||
%9%
Warning: Can't find topic NysbC900num2
-- DavidCowburn - 07 Sep 2004
| |||||||||
900 spectrometers at NYSBCStatus of 900#1 %9% MHz NMR system at NYSBC: Updated 10 Jun 2026STATUS: in production
| |||||||||||||||
| Added: | |||||||||||||||
| > > |
| ||||||||||||||
The magnet is at field at 900.27 MHz, and is cryoshimmed. It is stable. Various console issues are being pursued.
| |||||||||||||||
| Added: | |||||||||||||||
| > > | |||||||||||||||
| |||||||||||||||
| Added: | |||||||||||||||
| > > |
| ||||||||||||||
900 spectrometers at NYSBCStatus of 900#1 %9% MHz NMR system at NYSBC: Updated 10 Jun 2026STATUS: in production
The magnet is at field at 900.27 MHz, and is cryoshimmed. It is stable. Various console issues are being pursued.
|
900 spectrometers at NYSBCStatus of 900#1 %9% MHz NMR system at NYSBC: Updated 10 Jun 2026STATUS: in production | |||||||||||||||||
| Added: | |||||||||||||||||
| > > |
| ||||||||||||||||
The magnet is at field at 900.27 MHz, and is cryoshimmed. It is stable. Various console issues are being pursued.
| |||||||||||||||||
900 spectrometers at NYSBCStatus of 900#1 %9% MHz NMR system at NYSBC: Updated 10 Jun 2026STATUS: in productionThe magnet is at field at 900.27 MHz, and is cryoshimmed. It is stable. Various console issues are being pursued.
| |||||||||||||||||
| Added: | |||||||||||||||||
| > > |
| ||||||||||||||||
900 spectrometers at NYSBCStatus of 900#1 %9% MHz NMR system at NYSBC: Updated 10 Jun 2026STATUS: in productionThe magnet is at field at 900.27 MHz, and is cryoshimmed. It is stable. Various console issues are being pursued.
|
| |||||||||||||||
| Changed: | |||||||||||||||
| < < | %9%
Status of 900 MHz NMR system at NYSBC: Updated 10 Jun 2026STATUS: TESTING, transitioning to productionThe magnet is at field at 900.27 MHz, and is cryoshimmed. It is stabilizing. Various console issues are being pursued. | ||||||||||||||
| > > | Contents:
900 spectrometers at NYSBC | ||||||||||||||
| Added: | |||||||||||||||
| > > | Status of 900#1 %9% MHz NMR system at NYSBC: Updated 10 Jun 2026STATUS: in productionThe magnet is at field at 900.27 MHz, and is cryoshimmed. It is stable. Various console issues are being pursued. | ||||||||||||||
| |||||||||||||||
| Added: | |||||||||||||||
| > > | Warning: Can't find topic NysbC900num2 | ||||||||||||||
| -- DavidCowburn - 07 Sep 2004 | |||||||||||||||
| Changed: | |||||||||||||||||
| < < | Revision 10 is unreadable | ||||||||||||||||
| > > |
Status of 900 MHz NMR system at NYSBC: Updated 10 Jun 2026STATUS: TESTING, transitioning to productionThe magnet is at field at 900.27 MHz, and is cryoshimmed. It is stabilizing. Various console issues are being pursued.
| ||||||||||||||||
| Changed: | ||||||||
| < < | Revision 9 is unreadable | |||||||
| > > | Revision 10 is unreadable | |||||||
| Changed: | ||||||||
| < < | Revision 8 is unreadable | |||||||
| > > | Revision 9 is unreadable | |||||||
| Changed: | ||||||||
| < < | Revision 7 is unreadable | |||||||
| > > | Revision 8 is unreadable | |||||||
| Added: | |||||||||||||||
| > > | Revision 7 is unreadable | ||||||||||||||
| Deleted: | |||||||||||||||
| < < | 10 Jun 2026
Status of 900 MHz NMR system at NYSBC: Updated 10 Jun 2026STATUS: TESTINGThe magnet is at field at 900.27 MHz, and is cryoshimmed. It is stabilizing. Various console issues are being pursued.
| ||||||||||||||
| 10 Jun 2026 | ||||||||
| Changed: | ||||||||
| < < | Status of 900 MHz NMR system at NYSBC | |||||||
| > > | Status of 900 MHz NMR system at NYSBC: Updated 10 Jun 2026 | |||||||
| Added: | ||||||||
| > > | STATUS: TESTING | |||||||
The magnet is at field at 900.27 MHz, and is cryoshimmed. It is stabilizing. Various console issues are being pursued.
| ||||||||
| Changed: | ||||||||
| < < |
| |||||||
| > > |
| |||||||
| Added: | ||||||||
| > > |
| |||||||
| -- DavidCowburn - 07 Sep 2004 | ||||||||
10 Jun 2026
Status of 900 MHz NMR system at NYSBCThe magnet is at field at 900.27 MHz, and is cryoshimmed. It is stabilizing. Various console issues are being pursued.
| ||||||||
| Added: | ||||||||
| > > |
| |||||||
| -- DavidCowburn - 07 Sep 2004 | ||||||||
10 Jun 2026
Status of 900 MHz NMR system at NYSBCThe magnet is at field at 900.27 MHz, and is cryoshimmed. It is stabilizing. Various console issues are being pursued.
| ||||||||
| Added: | ||||||||
| > > |
| |||||||
| -- DavidCowburn - 07 Sep 2004 | ||||||||
10 Jun 2026
Status of 900 MHz NMR system at NYSBCThe magnet is at field at 900.27 MHz, and is cryoshimmed. It is stabilizing. Various console issues are being pursued. | ||||||||
| Added: | ||||||||
| > > |
| |||||||
| -- DavidCowburn - 07 Sep 2004 | ||||||||
10 Jun 2026
Status of 900 MHz NMR system at NYSBC | ||||||||
| Changed: | ||||||||
| < < | The magnet is at field at 900.27 MHz, and is being cryoshimmed | |||||||
| > > | The magnet is at field at 900.27 MHz, and is cryoshimmed. It is stabilizing. Various console issues are being pursued. | |||||||
| -- DavidCowburn - 07 Sep 2004 | ||||||||
10 Jun 2026
Status of 900 MHz NMR system at NYSBCThe magnet is at field at 900.27 MHz, and is being cryoshimmed-- DavidCowburn - 07 Sep 2004 |