Difference: TopItemnmr (1 vs. 41)

Revision 4127 Sep 2019 - Main.MichaelGoger

 

UPDATED

Grant Citations: Please remember to acknowledge NIH supported equipment in any submitted manuscripts: http://www.nysbc.net/twiki/bin/view/Main/SupportStatement

Deleted:
<
<
750: The new NEO console is available for general use.

750: A new 1.9mm HCN MAS probe for the 750 is due to be delivered from Bruker in early-July.

 700: The FCNMR high-field field-cycler (HFFC), a belt driven shuttle device, has been installed. The spectrometer is still available for standard non-shuttled experiments. The only difference though is the eject air is no longer used to insert sample in the magnet. This function is now done using the shuttle, it requires the use of unbroken shigemi or 7" standard tubes. Because of mechanical limitations 8" or 9" standard tubes or shigemi tubes that are short because of damage cannot be used.

Revision 4028 Jun 2019 - Main.MichaelGoger

 

UPDATED

Grant Citations: Please remember to acknowledge NIH supported equipment in any submitted manuscripts: http://www.nysbc.net/twiki/bin/view/Main/SupportStatement

Changed:
<
<
750: The new NEO console has been installed and will be available for general use soon.
>
>
750: The new NEO console is available for general use.
 
Changed:
<
<
750: A new 1.9mm HCN MAS probe for the 750 is due to be delivered from Bruker in mid-June.
>
>
750: A new 1.9mm HCN MAS probe for the 750 is due to be delivered from Bruker in early-July.
 700: The FCNMR high-field field-cycler (HFFC), a belt driven shuttle device, has been installed. The spectrometer is still available for standard non-shuttled experiments. The only difference though is the eject air is no longer used to insert sample in the magnet. This function is now done using the shuttle, it requires the use of unbroken shigemi or 7" standard tubes. Because of mechanical limitations 8" or 9" standard tubes or shigemi tubes that are short because of damage cannot be used.

Revision 3904 Jun 2019 - Main.MichaelGoger

 

UPDATED

Grant Citations: Please remember to acknowledge NIH supported equipment in any submitted manuscripts: http://www.nysbc.net/twiki/bin/view/Main/SupportStatement

750: The new NEO console has been installed and will be available for general use soon.

750: A new 1.9mm HCN MAS probe for the 750 is due to be delivered from Bruker in mid-June.

700: The FCNMR high-field field-cycler (HFFC), a belt driven shuttle device, has been installed. The spectrometer is still available for standard non-shuttled experiments. The only difference though is the eject air is no longer used to insert sample in the magnet. This function is now done using the shuttle, it requires the use of unbroken shigemi or 7" standard tubes. Because of mechanical limitations 8" or 9" standard tubes or shigemi tubes that are short because of damage cannot be used.

Revision 3831 May 2019 - Main.MichaelGoger

 

UPDATED

Changed:
<
<
750: The install of the new NEO console is scheduled to begin on May 13th.
>
>
Grant Citations: Please remember to acknowledge NIH supported equipment in any submitted manuscripts:
Added:
>
>
http://www.nysbc.net/twiki/bin/view/Main/SupportStatement

750: The new NEO console has been installed and will be available for general use soon.

 750: A new 1.9mm HCN MAS probe for the 750 is due to be delivered from Bruker in mid-June.

700: The FCNMR high-field field-cycler (HFFC), a belt driven shuttle device, has been installed. The spectrometer is still available for standard non-shuttled experiments. The only difference though is the eject air is no longer used to insert sample in the magnet. This function is now done using the shuttle, it requires the use of unbroken shigemi or 7" standard tubes. Because of mechanical limitations 8" or 9" standard tubes or shigemi tubes that are short because of damage cannot be used.

Revision 3703 May 2019 - Main.MichaelGoger

 

UPDATED

Added:
>
>
750: The install of the new NEO console is scheduled to begin on May 13th.

750: A new 1.9mm HCN MAS probe for the 750 is due to be delivered from Bruker in mid-June.

 700: The FCNMR high-field field-cycler (HFFC), a belt driven shuttle device, has been installed. The spectrometer is still available for standard non-shuttled experiments. The only difference though is the eject air is no longer used to insert sample in the magnet. This function is now done using the shuttle, it requires the use of unbroken shigemi or 7" standard tubes. Because of mechanical limitations 8" or 9" standard tubes or shigemi tubes that are short because of damage cannot be used.

Revision 3629 Mar 2019 - Main.MichaelGoger

 

UPDATED

700: The FCNMR high-field field-cycler (HFFC), a belt driven shuttle device, has been installed. The spectrometer is still available for standard non-shuttled experiments. The only difference though is the eject air is no longer used to insert sample in the magnet. This function is now done using the shuttle, it requires the use of unbroken shigemi or 7" standard tubes. Because of mechanical limitations 8" or 9" standard tubes or shigemi tubes that are short because of damage cannot be used.

Changed:
<
<
800US#2: Currently operating with a room temp 5mm TXI probe.
>
>
 

Revision 3527 Jan 2019 - Main.MichaelGoger

 

UPDATED

700: The FCNMR high-field field-cycler (HFFC), a belt driven shuttle device, has been installed. The spectrometer is still available for standard non-shuttled experiments. The only difference though is the eject air is no longer used to insert sample in the magnet. This function is now done using the shuttle, it requires the use of unbroken shigemi or 7" standard tubes. Because of mechanical limitations 8" or 9" standard tubes or shigemi tubes that are short because of damage cannot be used.

Changed:
<
<
800US#2: Currently operating with a loaner 5mm TXI cryoprobe.
>
>
800US#2: Currently operating with a room temp 5mm TXI probe.
 

Revision 3429 Jun 2018 - Main.MichaelGoger

 

UPDATED

Added:
>
>
700: The FCNMR high-field field-cycler (HFFC), a belt driven shuttle device, has been installed. The spectrometer is still available for standard non-shuttled experiments. The only difference though is the eject air is no longer used to insert sample in the magnet. This function is now done using the shuttle, it requires the use of unbroken shigemi or 7" standard tubes. Because of mechanical limitations 8" or 9" standard tubes or shigemi tubes that are short because of damage cannot be used.
 800US#2: Currently operating with a loaner 5mm TXI cryoprobe.

Revision 3331 May 2018 - Main.MichaelGoger

 

UPDATED

800US#2: Currently operating with a loaner 5mm TXI cryoprobe.

Changed:
<
<
500: Currently operating with a loaner 5mm TXI cryoprobe
>
>
 

Revision 3219 Apr 2018 - Main.MichaelGoger

 

UPDATED

Deleted:
<
<
900#2: Will be operating without a cryoprobe until further notice, sent for repair.
 800US#2: Currently operating with a loaner 5mm TXI cryoprobe.

500: Currently operating with a loaner 5mm TXI cryoprobe

Revision 3114 Jan 2018 - Main.MichaelGoger

 

UPDATED

900#2: Will be operating without a cryoprobe until further notice, sent for repair.

800US#2: Currently operating with a loaner 5mm TXI cryoprobe.

Added:
>
>
500: Currently operating with a loaner 5mm TXI cryoprobe
 

Revision 3015 Dec 2017 - Main.MichaelGoger

 

UPDATED

900#2: Will be operating without a cryoprobe until further notice, sent for repair.

800US#2: Currently operating with a loaner 5mm TXI cryoprobe.

Deleted:
<
<
500: Will be operating with room temp TXI probe until further notice, cryoprobe sent for repair.
 

Revision 2903 Nov 2017 - Main.MichaelGoger

 

UPDATED

900#2: Will be operating without a cryoprobe until further notice, sent for repair.

Changed:
<
<
800US#2: Currently operating with a loaner 5mm TXI cryoprobe. Arrangements for use with the 1.7mm TCI cryoprobe can be made upon request.
>
>
800US#2: Currently operating with a loaner 5mm TXI cryoprobe.
Added:
>
>
500: Will be operating with room temp TXI probe until further notice, cryoprobe sent for repair.
 

Revision 2809 Oct 2017 - Main.MichaelGoger

 

UPDATED

Added:
>
>
900#2: Will be operating without a cryoprobe until further notice, sent for repair.
 800US#2: Currently operating with a loaner 5mm TXI cryoprobe. Arrangements for use with the 1.7mm TCI cryoprobe can be made upon request.

Revision 2715 Sep 2017 - Main.MichaelGoger

 

UPDATED

Deleted:
<
<
900#2: Will be operating without a cryoprobe until further notice, sent for repair.
 800US#2: Currently operating with a loaner 5mm TXI cryoprobe. Arrangements for use with the 1.7mm TCI cryoprobe can be made upon request.

Revision 2604 Aug 2017 - Main.MichaelGoger

 

UPDATED

900#2: Will be operating without a cryoprobe until further notice, sent for repair.

Added:
>
>
800US#2: Currently operating with a loaner 5mm TXI cryoprobe. Arrangements for use with the 1.7mm TCI cryoprobe can be made upon request.
 

Revision 2519 Jun 2017 - Main.MichaelGoger

 

UPDATED

Changed:
<
<
The new 5mm TCI H&F cryoprobe has been installed on the 700. The proton coil can be tuned to fluorine for direct detection without 1H-decoupling.
>
>
900#2: Will be operating without a cryoprobe until further notice, sent for repair.
Deleted:
<
<
 

Revision 2420 Dec 2016 - Main.MichaelGoger

 

UPDATED

Added:
>
>
The new 5mm TCI H&F cryoprobe has been installed on the 700. The proton coil can be tuned to fluorine for direct detection without 1H-decoupling.
 

Revision 2325 Oct 2016 - Main.MichaelGoger

 

UPDATED

Changed:
<
<
HVAC Replacement/Start up
>
>
Deleted:
<
<
Start up of the replacement HVAC for the 800s, 750, and 500 spaces has been delayed again, new start date is October 5th. Until that time there may still be issues with instrument stability as room temperature changes.

 

Revision 2227 Sep 2016 - Main.MichaelGoger

 

UPDATED

HVAC Replacement/Start up

Changed:
<
<
The expectation is that on or around September 21st the replacement HVAC unit that services the 800s, 750, and 500 spaces will be fully operational. Until that time there may still be issues with instrument stability as room temperature changes.
>
>
Start up of the replacement HVAC for the 800s, 750, and 500 spaces has been delayed again, new start date is October 5th. Until that time there may still be issues with instrument stability as room temperature changes.
 

Revision 2109 Sep 2016 - Main.MichaelGoger

 

UPDATED

Changed:
<
<
HVAC Replacement
>
>
HVAC Replacement/Start up
 
Changed:
<
<
Starting on or around July 6th replacement of the HVAC unit that services the 800s, 750, and 500 spaces will begin. The entire replacement is scheduled to run until the end of August. During that time we will have no temperature control of the lab space. You are advised to consider carefully what experiments to run during this time period. There may be issues with lock stability or changes in pulse lengths as electronics change temperatures. Will attempt to keep the consoles operational during this time, however, as it will be summer, we may be forced to turn the consoles off if the lab temperature becomes excessive.
>
>
The expectation is that on or around September 21st the replacement HVAC unit that services the 800s, 750, and 500 spaces will be fully operational. Until that time there may still be issues with instrument stability as room temperature changes.

 

Revision 2023 Jun 2016 - Main.MichaelGoger

 

UPDATED

HVAC Replacement

Changed:
<
<
Starting on or around July 8th replacement of the HVAC unit that services the 800s, 750, and 500 spaces will begin. The entire replacement is scheduled to run until the end of August. During that time we will have no temperature control of the lab space. You are advised to consider carefully what experiments to run during this time period. There may be issues with lock stability or changes in pulse lengths as electronics change temperatures.
>
>
Starting on or around July 6th replacement of the HVAC unit that services the 800s, 750, and 500 spaces will begin. The entire replacement is scheduled to run until the end of August. During that time we will have no temperature control of the lab space. You are advised to consider carefully what experiments to run during this time period. There may be issues with lock stability or changes in pulse lengths as electronics change temperatures.
 Will attempt to keep the consoles operational during this time, however, as it will be summer, we may be forced to turn the consoles off if the lab temperature becomes excessive.

Revision 1917 Jun 2016 - Main.MichaelGoger

 

UPDATED

HVAC Replacement

Changed:
<
<
Starting on or around June 15th replacement of the HVAC unit that services the 800s, 750, and 500 spaces will begin. The entire replacement is scheduled to run until the beginning of August. During that time we will have no temperature control of the lab space. You are advised to consider carefully what experiments to run during this time period. There may be issues with lock stability or changes in pulse lengths as electronics change temperatures.
>
>
Starting on or around July 8th replacement of the HVAC unit that services the 800s, 750, and 500 spaces will begin. The entire replacement is scheduled to run until the end of August. During that time we will have no temperature control of the lab space. You are advised to consider carefully what experiments to run during this time period. There may be issues with lock stability or changes in pulse lengths as electronics change temperatures.
 Will attempt to keep the consoles operational during this time, however, as it will be summer, we may be forced to turn the consoles off if the lab temperature becomes excessive.

Revision 1826 May 2016 - Main.MichaelGoger

 

UPDATED

HVAC Replacement

Changed:
<
<
Starting on or around June 15th replacement of the HVAC unit that services the 800s, 750, and 500 spaces will begin. The entire replacement is scheduled to run until the beginning of August. At that time we will have no temperature control of the lab space. You are advised to consider carefully what experiments to run during this time period. There may be issues with lock stability or changes in pulse lengths as electronics change temperatures.
>
>
Starting on or around June 15th replacement of the HVAC unit that services the 800s, 750, and 500 spaces will begin. The entire replacement is scheduled to run until the beginning of August. During that time we will have no temperature control of the lab space. You are advised to consider carefully what experiments to run during this time period. There may be issues with lock stability or changes in pulse lengths as electronics change temperatures.
 Will attempt to keep the consoles operational during this time, however, as it will be summer, we may be forced to turn the consoles off if the lab temperature becomes excessive.

Revision 1726 May 2016 - Main.MichaelGoger

 

UPDATED

Changed:
<
<
* New Bruker AVANCEIII 700MHz spectrometer is fully operartional. *
>
>
HVAC Replacement
Added:
>
>
Starting on or around June 15th replacement of the HVAC unit that services the 800s, 750, and 500 spaces will begin. The entire replacement is scheduled to run until the beginning of August. At that time we will have no temperature control of the lab space. You are advised to consider carefully what experiments to run during this time period. There may be issues with lock stability or changes in pulse lengths as electronics change temperatures. Will attempt to keep the consoles operational during this time, however, as it will be summer, we may be forced to turn the consoles off if the lab temperature becomes excessive.
 

Revision 1628 Apr 2016 - Main.MichaelGoger

 

UPDATED

Changed:
<
<
* New Bruker AVANCEIII 700MHz spectrometer has been rescheduled for delivery 2/1/16. The installation is due to begin in early March and hopefully the spectrometer will be available for use by early April. *
>
>
* New Bruker AVANCEIII 700MHz spectrometer is fully operartional. *
 

Revision 1522 Jan 2016 - Main.MichaelGoger

 

UPDATED

Changed:
<
<
* New Bruker AVANCEIII 700MHz spectrometer is scheduled for delivery 1/25/16. The installation is due to begin in early March and hopefully the spectrometer will be available for use by early April. *
>
>
* New Bruker AVANCEIII 700MHz spectrometer has been rescheduled for delivery 2/1/16. The installation is due to begin in early March and hopefully the spectrometer will be available for use by early April. *
 

Revision 1419 Jan 2016 - Main.MichaelGoger

 

UPDATED

Changed:
<
<
* NOTICE: The spectrometer frequencies on 900#1 and 900#2 have been changed to 900.03MHz and 900.13MHz, respectively, on 05/19/15.
>
>
* New Bruker AVANCEIII 700MHz spectrometer is scheduled for delivery 1/25/16. The installation is due to begin in early March and hopefully the spectrometer will be available for use by early April. *
Deleted:
<
<
When using parameter sets from before the frequency change, you must enter "edasp", select "default" then "save"; you must also check your offsets, O1P, 02P, etc... New experiments started using "seqlib" should be able to handle the frequency change. *
 

Revision 1327 May 2015 - Main.MichaelGoger

 

UPDATED

Changed:
<
<
**
>
>
* NOTICE: The spectrometer frequencies on 900#1 and 900#2 have been changed to 900.03MHz and 900.13MHz, respectively, on 05/19/15.
Added:
>
>
When using parameter sets from before the frequency change, you must enter "edasp", select "default" then "save"; you must also check your offsets, O1P, 02P, etc... New experiments started using "seqlib" should be able to handle the frequency change. *
 

Revision 1207 Nov 2012 - Main.MichaelGoger

 

UPDATED

Changed:
<
<
5/29 - 6/4/12 Scheduled water chiller shutdown/maintenance. 500, 600, 800US#1 and 800USconv will not be available this week.
>
>
**
 

Revision 1107 Mar 2012 - Main.MichaelGoger

 

UPDATED

Changed:
<
<
The Samplejet sample changer will be installed on 800Us#2 with the 800 MHz 1.7mm cryoprobe during the week of 1/17/2012.*
>
>
5/29 - 6/4/12 Scheduled water chiller shutdown/maintenance. 500, 600, 800US#1 and 800USconv will not be available this week.
 

Revision 1004 Jan 2012 - Main.MichaelGoger

 

UPDATED

Deleted:
<
<
NMR Staff will be off for Thanksgiving on 11/24 and 11/25.
 
Changed:
<
<
Topspin 3.0 has been installed on 900#2.
The Samplejet sample changer is expected to be delivered in late Nov. or early Dec. It will be installed on 800Us#2 with the 800 MHz 1.7mm cryoprobe.
>
>
The Samplejet sample changer will be installed on 800Us#2 with the 800 MHz 1.7mm cryoprobe during the week of 1/17/2012.*
 

Revision 923 Nov 2011 - Main.MichaelGoger

 

UPDATED

Added:
>
>
NMR Staff will be off for Thanksgiving on 11/24 and 11/25.
  Topspin 3.0 has been installed on 900#2.
The Samplejet sample changer is expected to be delivered in late Nov. or early Dec. It will be installed on 800Us#2 with the 800 MHz 1.7mm cryoprobe.

Revision 814 Nov 2011 - Main.MichaelGoger

 

UPDATED

Changed:
<
<
The 800 MHz 1.7mm cryoprobe has been repaired and will be installed on 800US#2 during the week of 20 Sep. If the installation is successful this will be the default probe on beginning on the week of 18 Oct.
>
>
Topspin 3.0 has been installed on 900#2.
The Samplejet sample changer is expected to be delivered in late Nov. or early Dec. It will be installed on 800Us#2 with the 800 MHz 1.7mm cryoprobe.
 

Revision 707 Sep 2011 - Main.MichaelGoger

 

Added:
>
>
UPDATED
 
Changed:
<
<
The 800 MHz 1.7mm cryoprobe is being returned to Bruker for inspection and cleaning. The 5mm TXI cryoprobe has been installed on 800conv as of 4/12/11
>
>
The 800 MHz 1.7mm cryoprobe has been repaired and will be installed on 800US#2 during the week of 20 Sep. If the installation is successful this will be the default probe on beginning on the week of 18 Oct.
 

Revision 614 Apr 2011 - Main.MichaelGoger

 

Changed:
<
<
The 800 MHz 1.7mm cryoprobe is been returned to Burker for inspection and cleaning. The 5mm TXI cryoprobe has been installed on 800conv as of 4/12/11
>
>
The 800 MHz 1.7mm cryoprobe is being returned to Bruker for inspection and cleaning. The 5mm TXI cryoprobe has been installed on 800conv as of 4/12/11
 

Revision 514 Apr 2011 - Main.MichaelGoger

 

Changed:
<
<
The 800 MHz 1.7mm cryoprobe has been re-installed on 3/14/11!!!!!
>
>
The 800 MHz 1.7mm cryoprobe is been returned to Burker for inspection and cleaning. The 5mm TXI cryoprobe has been installed on 800conv as of 4/12/11
 

Revision 417 Mar 2011 - Main.MichaelGoger

 

Changed:
<
<
The 800 MHz 1.7mm cryoprobe is scheduled to be re-installed 3/14/11!!!!!
>
>
The 800 MHz 1.7mm cryoprobe has been re-installed on 3/14/11!!!!!
 

Revision 309 Mar 2011 - Main.MichaelGoger

 

The 800 MHz 1.7mm cryoprobe is scheduled to be re-installed 3/14/11!!!!!

Deleted:
<
<
-- MichaelGoger - 09 Mar 2011
 

Revision 209 Mar 2011 - Main.MichaelGoger

 

The 800 MHz 1.7mm cryoprobe is scheduled to be re-installed 3/14/11!!!!!

Deleted:
<
<
NYSBC Infotech WILL NEVER ASK YOU TO PROVIDE PASSWORD INFORMATION, AND WILL NOT ASK YOU TO OPEN FILES ATTACHED TO EMAILS. PLEASE EXERCISE CARE WITH DECEPTIVE EMAILS

  • NYSBC closed on Federal Holidays -
  • 19 Jun 2026 - Friday, Jun 19 Juneteenth National Independence Day
  • 03 Jul 2026 - Friday, Jul 3 Independence Day (observed)
  • 07 Sep 2026 - Monday, Sep 7 Labor Day
 

-- MichaelGoger - 09 Mar 2011

Revision 109 Mar 2011 - Main.MichaelGoger

 

The 800 MHz 1.7mm cryoprobe is scheduled to be re-installed 3/14/11!!!!!

NYSBC Infotech WILL NEVER ASK YOU TO PROVIDE PASSWORD INFORMATION, AND WILL NOT ASK YOU TO OPEN FILES ATTACHED TO EMAILS. PLEASE EXERCISE CARE WITH DECEPTIVE EMAILS

  • NYSBC closed on Federal Holidays -
  • 19 Jun 2026 - Friday, Jun 19 Juneteenth National Independence Day
  • 03 Jul 2026 - Friday, Jul 3 Independence Day (observed)
  • 07 Sep 2026 - Monday, Sep 7 Labor Day

-- MichaelGoger - 09 Mar 2011

 