| < < | 750: The new NEO console is available for general use. 750: A new 1.9mm HCN MAS probe for the 750 is due to be delivered from Bruker in early-July. | |||||||
| 700: The FCNMR high-field field-cycler (HFFC), a belt driven shuttle device, has been installed. The spectrometer is still available for standard non-shuttled experiments. The only difference though is the eject air is no longer used to insert sample in the magnet. This function is now done using the shuttle, it requires the use of unbroken shigemi or 7" standard tubes. Because of mechanical limitations 8" or 9" standard tubes or shigemi tubes that are short because of damage cannot be used. | ||||||||
| Changed: | ||||||||
| < < | 750: The new NEO console has been installed and will be available for general use soon. | |||||||
| > > | 750: The new NEO console is available for general use. | |||||||
| Changed: | ||||||||
| < < | 750: A new 1.9mm HCN MAS probe for the 750 is due to be delivered from Bruker in mid-June. | |||||||
| > > | 750: A new 1.9mm HCN MAS probe for the 750 is due to be delivered from Bruker in early-July. | |||||||
| 700: The FCNMR high-field field-cycler (HFFC), a belt driven shuttle device, has been installed. The spectrometer is still available for standard non-shuttled experiments. The only difference though is the eject air is no longer used to insert sample in the magnet. This function is now done using the shuttle, it requires the use of unbroken shigemi or 7" standard tubes. Because of mechanical limitations 8" or 9" standard tubes or shigemi tubes that are short because of damage cannot be used. | ||||||||
| Changed: | ||||||||
| < < | 750: The install of the new NEO console is scheduled to begin on May 13th. | |||||||
| > > | Grant Citations: Please remember to acknowledge NIH supported equipment in any submitted manuscripts: | |||||||
| Added: | ||||||||
| > > | http://www.nysbc.net/twiki/bin/view/Main/SupportStatement 750: The new NEO console has been installed and will be available for general use soon. | |||||||
| 750: A new 1.9mm HCN MAS probe for the 750 is due to be delivered from Bruker in mid-June. 700: The FCNMR high-field field-cycler (HFFC), a belt driven shuttle device, has been installed. The spectrometer is still available for standard non-shuttled experiments. The only difference though is the eject air is no longer used to insert sample in the magnet. This function is now done using the shuttle, it requires the use of unbroken shigemi or 7" standard tubes. Because of mechanical limitations 8" or 9" standard tubes or shigemi tubes that are short because of damage cannot be used. | ||||||||
| Added: | ||||||||
| > > | 750: The install of the new NEO console is scheduled to begin on May 13th. 750: A new 1.9mm HCN MAS probe for the 750 is due to be delivered from Bruker in mid-June. | |||||||
| 700: The FCNMR high-field field-cycler (HFFC), a belt driven shuttle device, has been installed. The spectrometer is still available for standard non-shuttled experiments. The only difference though is the eject air is no longer used to insert sample in the magnet. This function is now done using the shuttle, it requires the use of unbroken shigemi or 7" standard tubes. Because of mechanical limitations 8" or 9" standard tubes or shigemi tubes that are short because of damage cannot be used. | ||||||||
| Changed: | ||||||||
| < < | 800US#2: Currently operating with a room temp 5mm TXI probe. | |||||||
| > > | ||||||||
| Changed: | ||||||||
| < < | 800US#2: Currently operating with a loaner 5mm TXI cryoprobe. | |||||||
| > > | 800US#2: Currently operating with a room temp 5mm TXI probe. | |||||||
| Added: | ||||||||
| > > | 700: The FCNMR high-field field-cycler (HFFC), a belt driven shuttle device, has been installed. The spectrometer is still available for standard non-shuttled experiments. The only difference though is the eject air is no longer used to insert sample in the magnet. This function is now done using the shuttle, it requires the use of unbroken shigemi or 7" standard tubes. Because of mechanical limitations 8" or 9" standard tubes or shigemi tubes that are short because of damage cannot be used. | |||||||
| 800US#2: Currently operating with a loaner 5mm TXI cryoprobe. | ||||||||
| Changed: | ||||||||
| < < | 500: Currently operating with a loaner 5mm TXI cryoprobe | |||||||
| > > | ||||||||
| Deleted: | ||||||||
| < < | 900#2: Will be operating without a cryoprobe until further notice, sent for repair. | |||||||
| 800US#2: Currently operating with a loaner 5mm TXI cryoprobe. 500: Currently operating with a loaner 5mm TXI cryoprobe | ||||||||
| Added: | ||||||||
| > > | 500: Currently operating with a loaner 5mm TXI cryoprobe | |||||||
| Deleted: | ||||||||
| < < | 500: Will be operating with room temp TXI probe until further notice, cryoprobe sent for repair. | |||||||
| Changed: | ||||||||
| < < | 800US#2: Currently operating with a loaner 5mm TXI cryoprobe. Arrangements for use with the 1.7mm TCI cryoprobe can be made upon request. | |||||||
| > > | 800US#2: Currently operating with a loaner 5mm TXI cryoprobe. | |||||||
| Added: | ||||||||
| > > | 500: Will be operating with room temp TXI probe until further notice, cryoprobe sent for repair. | |||||||
| Added: | ||||||||
| > > | 900#2: Will be operating without a cryoprobe until further notice, sent for repair. | |||||||
| 800US#2: Currently operating with a loaner 5mm TXI cryoprobe. Arrangements for use with the 1.7mm TCI cryoprobe can be made upon request. | ||||||||
| Deleted: | ||||||||
| < < | 900#2: Will be operating without a cryoprobe until further notice, sent for repair. | |||||||
| 800US#2: Currently operating with a loaner 5mm TXI cryoprobe. Arrangements for use with the 1.7mm TCI cryoprobe can be made upon request. | ||||||||
| Added: | ||||||||
| > > | 800US#2: Currently operating with a loaner 5mm TXI cryoprobe. Arrangements for use with the 1.7mm TCI cryoprobe can be made upon request. | |||||||
| Changed: | ||||||||
| < < | The new 5mm TCI H&F cryoprobe has been installed on the 700. The proton coil can be tuned to fluorine for direct detection without 1H-decoupling. | |||||||
| > > | 900#2: Will be operating without a cryoprobe until further notice, sent for repair. | |||||||
| Deleted: | ||||||||
| < < | ||||||||
| Added: | ||||||||
| > > | The new 5mm TCI H&F cryoprobe has been installed on the 700. The proton coil can be tuned to fluorine for direct detection without 1H-decoupling. | |||||||
| Changed: | ||||||||
| < < | HVAC Replacement/Start up | |||||||
| > > | ||||||||
| Deleted: | ||||||||
| < < | Start up of the replacement HVAC for the 800s, 750, and 500 spaces has been delayed again, new start date is October 5th. Until that time there may still be issues with instrument stability as room temperature changes. | |||||||
| Changed: | ||||||||
| < < | The expectation is that on or around September 21st the replacement HVAC unit that services the 800s, 750, and 500 spaces will be fully operational. Until that time there may still be issues with instrument stability as room temperature changes. | |||||||
| > > | Start up of the replacement HVAC for the 800s, 750, and 500 spaces has been delayed again, new start date is October 5th. Until that time there may still be issues with instrument stability as room temperature changes. | |||||||
| Changed: | ||||||||
| < < | HVAC Replacement | |||||||
| > > | HVAC Replacement/Start up | |||||||
| Changed: | ||||||||
| < < | Starting on or around July 6th replacement of the HVAC unit that services the 800s, 750, and 500 spaces will begin. The entire replacement is scheduled to run until the end of August. During that time we will have no temperature control of the lab space. You are advised to consider carefully what experiments to run during this time period. There may be issues with lock stability or changes in pulse lengths as electronics change temperatures. Will attempt to keep the consoles operational during this time, however, as it will be summer, we may be forced to turn the consoles off if the lab temperature becomes excessive. | |||||||
| > > | The expectation is that on or around September 21st the replacement HVAC unit that services the 800s, 750, and 500 spaces will be fully operational. Until that time there may still be issues with instrument stability as room temperature changes. | |||||||
| Changed: | ||||||||
| < < | Starting on or around July 8th replacement of the HVAC unit that services the 800s, 750, and 500 spaces will begin. The entire replacement is scheduled to run until the end of August. During that time we will have no temperature control of the lab space. You are advised to consider carefully what experiments to run during this time period. There may be issues with lock stability or changes in pulse lengths as electronics change temperatures. | |||||||
| > > | Starting on or around July 6th replacement of the HVAC unit that services the 800s, 750, and 500 spaces will begin. The entire replacement is scheduled to run until the end of August. During that time we will have no temperature control of the lab space. You are advised to consider carefully what experiments to run during this time period. There may be issues with lock stability or changes in pulse lengths as electronics change temperatures. | |||||||
| Will attempt to keep the consoles operational during this time, however, as it will be summer, we may be forced to turn the consoles off if the lab temperature becomes excessive. | ||||||||
| Changed: | ||||||||
| < < | Starting on or around June 15th replacement of the HVAC unit that services the 800s, 750, and 500 spaces will begin. The entire replacement is scheduled to run until the beginning of August. During that time we will have no temperature control of the lab space. You are advised to consider carefully what experiments to run during this time period. There may be issues with lock stability or changes in pulse lengths as electronics change temperatures. | |||||||
| > > | Starting on or around July 8th replacement of the HVAC unit that services the 800s, 750, and 500 spaces will begin. The entire replacement is scheduled to run until the end of August. During that time we will have no temperature control of the lab space. You are advised to consider carefully what experiments to run during this time period. There may be issues with lock stability or changes in pulse lengths as electronics change temperatures. | |||||||
| Will attempt to keep the consoles operational during this time, however, as it will be summer, we may be forced to turn the consoles off if the lab temperature becomes excessive. | ||||||||
| Changed: | ||||||||
| < < | Starting on or around June 15th replacement of the HVAC unit that services the 800s, 750, and 500 spaces will begin. The entire replacement is scheduled to run until the beginning of August. At that time we will have no temperature control of the lab space. You are advised to consider carefully what experiments to run during this time period. There may be issues with lock stability or changes in pulse lengths as electronics change temperatures. | |||||||
| > > | Starting on or around June 15th replacement of the HVAC unit that services the 800s, 750, and 500 spaces will begin. The entire replacement is scheduled to run until the beginning of August. During that time we will have no temperature control of the lab space. You are advised to consider carefully what experiments to run during this time period. There may be issues with lock stability or changes in pulse lengths as electronics change temperatures. | |||||||
| Will attempt to keep the consoles operational during this time, however, as it will be summer, we may be forced to turn the consoles off if the lab temperature becomes excessive. | ||||||||
| Changed: | ||||||||
| < < | * New Bruker AVANCEIII 700MHz spectrometer is fully operartional. * | |||||||
| > > | HVAC Replacement | |||||||
| Added: | ||||||||
| > > | Starting on or around June 15th replacement of the HVAC unit that services the 800s, 750, and 500 spaces will begin. The entire replacement is scheduled to run until the beginning of August. At that time we will have no temperature control of the lab space. You are advised to consider carefully what experiments to run during this time period. There may be issues with lock stability or changes in pulse lengths as electronics change temperatures. Will attempt to keep the consoles operational during this time, however, as it will be summer, we may be forced to turn the consoles off if the lab temperature becomes excessive. | |||||||
| Changed: | ||||||||
| < < | * New Bruker AVANCEIII 700MHz spectrometer has been rescheduled for delivery 2/1/16. The installation is due to begin in early March and hopefully the spectrometer will be available for use by early April. * | |||||||
| > > | * New Bruker AVANCEIII 700MHz spectrometer is fully operartional. * | |||||||
| Changed: | ||||||||
| < < | * New Bruker AVANCEIII 700MHz spectrometer is scheduled for delivery 1/25/16. The installation is due to begin in early March and hopefully the spectrometer will be available for use by early April. * | |||||||
| > > | * New Bruker AVANCEIII 700MHz spectrometer has been rescheduled for delivery 2/1/16. The installation is due to begin in early March and hopefully the spectrometer will be available for use by early April. * | |||||||
| Changed: | ||||||||
| < < | * NOTICE: The spectrometer frequencies on 900#1 and 900#2 have been changed to 900.03MHz and 900.13MHz, respectively, on 05/19/15. | |||||||
| > > | * New Bruker AVANCEIII 700MHz spectrometer is scheduled for delivery 1/25/16. The installation is due to begin in early March and hopefully the spectrometer will be available for use by early April. * | |||||||
| Deleted: | ||||||||
| < < | When using parameter sets from before the frequency change, you must enter "edasp", select "default" then "save"; you must also check your offsets, O1P, 02P, etc... New experiments started using "seqlib" should be able to handle the frequency change. * | |||||||
| Changed: | ||||||||
| < < | ** | |||||||
| > > | * NOTICE: The spectrometer frequencies on 900#1 and 900#2 have been changed to 900.03MHz and 900.13MHz, respectively, on 05/19/15. | |||||||
| Added: | ||||||||
| > > | When using parameter sets from before the frequency change, you must enter "edasp", select "default" then "save"; you must also check your offsets, O1P, 02P, etc... New experiments started using "seqlib" should be able to handle the frequency change. * | |||||||
| Changed: | ||||||||
| < < | 5/29 - 6/4/12 Scheduled water chiller shutdown/maintenance. 500, 600, 800US#1 and 800USconv will not be available this week. | |||||||
| > > | ** | |||||||
| Changed: | ||||||||
| < < | The Samplejet sample changer will be installed on 800Us#2 with the 800 MHz 1.7mm cryoprobe during the week of 1/17/2012.* | |||||||
| > > | 5/29 - 6/4/12 Scheduled water chiller shutdown/maintenance. 500, 600, 800US#1 and 800USconv will not be available this week. | |||||||
| Deleted: | ||||||||
| < < | NMR Staff will be off for Thanksgiving on 11/24 and 11/25. | |||||||
| Changed: | ||||||||
| < < | Topspin 3.0 has been installed on 900#2. The Samplejet sample changer is expected to be delivered in late Nov. or early Dec. It will be installed on 800Us#2 with the 800 MHz 1.7mm cryoprobe. | |||||||
| > > | The Samplejet sample changer will be installed on 800Us#2 with the 800 MHz 1.7mm cryoprobe during the week of 1/17/2012.* | |||||||
| Added: | ||||||||
| > > | NMR Staff will be off for Thanksgiving on 11/24 and 11/25. | |||||||
| Topspin 3.0 has been installed on 900#2. The Samplejet sample changer is expected to be delivered in late Nov. or early Dec. It will be installed on 800Us#2 with the 800 MHz 1.7mm cryoprobe. | ||||||||
| Changed: | ||||||||
| < < | The 800 MHz 1.7mm cryoprobe has been repaired and will be installed on 800US#2 during the week of 20 Sep. If the installation is successful this will be the default probe on beginning on the week of 18 Oct. | |||||||
| > > | Topspin 3.0 has been installed on 900#2. The Samplejet sample changer is expected to be delivered in late Nov. or early Dec. It will be installed on 800Us#2 with the 800 MHz 1.7mm cryoprobe. | |||||||
| Added: | ||||||||
| > > | ||||||||
| Changed: | ||||||||
| < < | The 800 MHz 1.7mm cryoprobe is being returned to Bruker for inspection and cleaning. The 5mm TXI cryoprobe has been installed on 800conv as of 4/12/11 | |||||||
| > > | The 800 MHz 1.7mm cryoprobe has been repaired and will be installed on 800US#2 during the week of 20 Sep. If the installation is successful this will be the default probe on beginning on the week of 18 Oct. | |||||||
| Changed: | ||||||||
| < < | The 800 MHz 1.7mm cryoprobe is been returned to Burker for inspection and cleaning. The 5mm TXI cryoprobe has been installed on 800conv as of 4/12/11 | |||||||
| > > | The 800 MHz 1.7mm cryoprobe is being returned to Bruker for inspection and cleaning. The 5mm TXI cryoprobe has been installed on 800conv as of 4/12/11 | |||||||
| Changed: | ||||||||
| < < | The 800 MHz 1.7mm cryoprobe has been re-installed on 3/14/11!!!!! | |||||||
| > > | The 800 MHz 1.7mm cryoprobe is been returned to Burker for inspection and cleaning. The 5mm TXI cryoprobe has been installed on 800conv as of 4/12/11 | |||||||
| Changed: | ||||||||
| < < | The 800 MHz 1.7mm cryoprobe is scheduled to be re-installed 3/14/11!!!!! | |||||||
| > > | The 800 MHz 1.7mm cryoprobe has been re-installed on 3/14/11!!!!! | |||||||
The 800 MHz 1.7mm cryoprobe is scheduled to be re-installed 3/14/11!!!!! | ||||||||
| Deleted: | ||||||||
| < < | -- MichaelGoger - 09 Mar 2011 | |||||||
The 800 MHz 1.7mm cryoprobe is scheduled to be re-installed 3/14/11!!!!! | ||||||||
| Deleted: | ||||||||
| < < | NYSBC Infotech WILL NEVER ASK YOU TO PROVIDE PASSWORD INFORMATION, AND WILL NOT ASK YOU TO OPEN FILES ATTACHED TO EMAILS. PLEASE EXERCISE CARE WITH DECEPTIVE EMAILS
| |||||||
| -- MichaelGoger - 09 Mar 2011 | ||||||||
The 800 MHz 1.7mm cryoprobe is scheduled to be re-installed 3/14/11!!!!! NYSBC Infotech WILL NEVER ASK YOU TO PROVIDE PASSWORD INFORMATION, AND WILL NOT ASK YOU TO OPEN FILES ATTACHED TO EMAILS. PLEASE EXERCISE CARE WITH DECEPTIVE EMAILS
|